South Harrison Street Improvements Project Within the Village of Sherwood RFP
Posted
Nov 7, 2026
Nov 23, 2026
Work includes 7,840 SF of concrete walk and drive removal; 575 SF of gravel drive removal and replacement; 1,350 CY of roadway / parking lot excavation; 4,350 SY of subgrade compaction; 310 CY of subgrade improvements (6" - 50% of roadway / parking lot); 20 SY of 1. 5" asphalt pavement planing for butt joints; 1,250 SY of 4. 25" asphalt pavement planing; 7,740 SF of 4" concrete walk; 2,210 LF of concrete curb and gutter; 315 LF of 6" storm sewer laterals with granular backfill; 100 LF of storm sewer repairs (4" to 8"). See attached files.