GAOA Sand Pond Trail Boardwalk Replacement Tahoe NF - Request for Quotation (RFQ)
Aug 17, 2026
Closes
Sep 14, 2026
Work items include but are not limited to: Removal and disposal of existing damaged sawn timber trail bridge. Removal and disposal of existing 100 LF boardwalk segment. Removal and disposal of 2 existing lumber piles about 10’ X 10’ and 15’X 15’. Furnish and install 4-foot-wide accessible boardwalk with pullouts on Diamond Pier DP-75 (or equivalent) 50” anchor foundation approximately 1100 feet in length. Furnish and install standard sawn timber trail bridge 25 feet in length. Deliver, stockpile, and provide and install erosion control protection of 20 cubic yards of 3/8” crusher fines for wheelchair accessible path near the trailhead.