Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Sullivan County
1 LS Stream Diversion & Dewatering; 1 LS R-8 Riprap; 1 LF Grouted R-8 Riprap; 1 LS "Eroded Void #1" – LDG Design; 1 LS Removal of Gravel Deposit in front of house & from box culvert; 1 LS Topsoiling/Seeding/Mulching; 1 LS Chain-link Fence; 1 LF Guide Rail – LDG Design.
Posted Date
May 13, 2026
Due Date
Jun 12, 2026
Release: May 13, 2026
Sullivan County
Close: Jun 12, 2026
1 LS Stream Diversion & Dewatering; 1 LS R-8 Riprap; 1 LF Grouted R-8 Riprap; 1 LS "Eroded Void #1" – LDG Design; 1 LS Removal of Gravel Deposit in front of house & from box culvert; 1 LS Topsoiling/Seeding/Mulching; 1 LS Chain-link Fence; 1 LF Guide Rail – LDG Design.
AvailableSullivan County
Sewer System Investigation Project consists of preflushing and televising approx. 6,500 LF of 2" through 4" sanitary sewer. The Project also includes installation of vacuum excavated cleanouts as necessary to accommodate televising.
Posted Date
Apr 22, 2026
Due Date
May 15, 2026
Release: Apr 22, 2026
Sullivan County
Close: May 15, 2026
Sewer System Investigation Project consists of preflushing and televising approx. 6,500 LF of 2" through 4" sanitary sewer. The Project also includes installation of vacuum excavated cleanouts as necessary to accommodate televising.
Sullivan County
Installation of 70 ft. (Including the 10' cutoff) of Stacked Rock installed to the top of bank (approx. 4.5 ft high, shown on the Planview Drawing). Work also includes final grading and seeding of disturbed areas.
Posted Date
Mar 4, 2026
Due Date
Apr 3, 2026
Release: Mar 4, 2026
Sullivan County
Close: Apr 3, 2026
Installation of 70 ft. (Including the 10' cutoff) of Stacked Rock installed to the top of bank (approx. 4.5 ft high, shown on the Planview Drawing). Work also includes final grading and seeding of disturbed areas.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Sullivan County
The commissioners addressed various administrative and operational items, including tabling a revised IT and cybersecurity policy, proclaiming Conservation District Week, and awarding multiple bids for emergency watershed improvement projects and county mowing services. The board approved a new office space lease, the installation of a voting system software upgrade, the purchase of a woodchipper for bridge maintenance, and contract extensions for building control services. Furthermore, they approved an increase to the assessment exporting fee, authorized use of the plaza for the National Day of Prayer, handled travel requests for various county departments, and reviewed and paid current invoices.
The meeting included discussions on personnel actions, specifically the hiring of a Conservation Resource Technician and the setting of their hourly wage. Additional business included acknowledging a staff resignation, approving a Family Medical Leave Act request for up to twelve weeks, and considering a request for donated sick, vacation, and personal leave.
The meeting included the consideration of several personnel actions, such as hiring a new Administrative Clerk III and setting the wage for this position. The Board also reviewed the satisfactory completion of a probationary period for a Library Assistant II, along with a corresponding wage increase. Additionally, the Board considered a salary adjustment for the Chief Clerk II, revisions to job descriptions for the Conservation Resource Technician and Director of Children and Youth Services, and the approval of two separate Family Medical Leave Act requests.
The meeting agenda includes consideration of the General Primary Election Proclamation and the appointment of various election officials, including Judges of Election and Minority Inspectors for several precincts and townships, to support the upcoming General Primary Election.
The board meeting agenda included the adoption of a revised Information Technology and Cybersecurity Policy. New business items involved the approval of a local funds match for the BeST Transportation Authority, the recognition of ALS Awareness Month, and the authorization of multiple lease agreements at the Mattern Building for warehouse and office space. The commissioners also addressed the acceptance of a software license and warranty quote for election equipment and appointed several individuals to the Camp Flea Board. Personnel matters included the hiring of an Administrative Clerk III and the approval of various conference and travel requests for the Planning, IT, and Auditor offices.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Sullivan County's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
911 Coordinator / Deputy Director of Emergency Services
County Solicitor (General Counsel), Sullivan County, Pennsylvania
Premium
Access the largest public sector contact database
© 2026 Starbridge