Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Stockbridge Munsee Community's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Stockbridge Munsee Community
RFP for an artwork design to be used on promotional clothing for the 50th Annual Mohican POWWOW.
Posted Date
Jan 7, 2026
Due Date
Feb 9, 2026
Release: Jan 7, 2026
Stockbridge Munsee Community
Close: Feb 9, 2026
RFP for an artwork design to be used on promotional clothing for the 50th Annual Mohican POWWOW.
AvailableStockbridge Munsee Community
Complete improvements to an existing 136’ tall 250,000-gallon steel pedestal elevated spheroid water storage tank, including but not limited to: 1. Remove existing insulation and coating system from exterior and apply new coating system, including logo. 2. Remove existing coating system from interior wet and apply new coating system. 3. Remove existing insulation and coating system from interior dry sweat areas (dry access tube and bowl) and apply new coating system. 4. Remove existing coating system from interior dry riser pipe, platforms (3 total), and stem above top platform, and apply new coating system. Aluminum jacketing and insulation shall be removed from riser pipe to perform the work and reinstalled after the new coating system is applied. 5. Recondition interior dry non-sweat coating system by performing spot repairs to damaged areas. 6. Install a mixer system in the interior wet, with control panel installed in the heated enclosure. 7. Remove existing heated enclosure in base bell and construct a new heated enclosure, including concrete flatwork. 8. Perform other miscellaneous tower improvements.
Posted Date
Mar 6, 2025
Due Date
Apr 3, 2025
Release: Mar 6, 2025
Stockbridge Munsee Community
Close: Apr 3, 2025
Complete improvements to an existing 136’ tall 250,000-gallon steel pedestal elevated spheroid water storage tank, including but not limited to: 1. Remove existing insulation and coating system from exterior and apply new coating system, including logo. 2. Remove existing coating system from interior wet and apply new coating system. 3. Remove existing insulation and coating system from interior dry sweat areas (dry access tube and bowl) and apply new coating system. 4. Remove existing coating system from interior dry riser pipe, platforms (3 total), and stem above top platform, and apply new coating system. Aluminum jacketing and insulation shall be removed from riser pipe to perform the work and reinstalled after the new coating system is applied. 5. Recondition interior dry non-sweat coating system by performing spot repairs to damaged areas. 6. Install a mixer system in the interior wet, with control panel installed in the heated enclosure. 7. Remove existing heated enclosure in base bell and construct a new heated enclosure, including concrete flatwork. 8. Perform other miscellaneous tower improvements.
Stockbridge Munsee Community
Community's 250,000-gallon elevated steel spheroid water tower recoated in the summer of 2025.
Posted Date
Mar 6, 2025
Due Date
Apr 3, 2025
Release: Mar 6, 2025
Stockbridge Munsee Community
Close: Apr 3, 2025
Community's 250,000-gallon elevated steel spheroid water tower recoated in the summer of 2025.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.