Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Lac du Flambeau Tribe
Work includes approx 324 LF of 36W" prestressed girder type 1; 250 LF of railing tubular Type M; 1,150 LF of 14x0.50" piling CIP concrete; 174 LF of 6" pipe underdrain; 2,239 CY of borrow; 23,420 LB of bar steel reinforcement HS structures.
Posted Date
Mar 25, 2026
Due Date
Apr 30, 2026
Release: Mar 25, 2026
Lac du Flambeau Tribe
Close: Apr 30, 2026
Work includes approx 324 LF of 36W" prestressed girder type 1; 250 LF of railing tubular Type M; 1,150 LF of 14x0.50" piling CIP concrete; 174 LF of 6" pipe underdrain; 2,239 CY of borrow; 23,420 LB of bar steel reinforcement HS structures.
AvailableLac du Flambeau Tribe
Work includes approx 324 LF of 36W" prestressed girder type 1; 250 LF of railing tubular Type M; 1,150 LF of 14x0.50" piling CIP concrete; 174 LF of 6" pipe underdrain; 2,239 CY of borrow; 23,420 LB of bar steel reinforcement HS structures.
Posted Date
Mar 25, 2026
Due Date
Apr 30, 2026
Release: Mar 25, 2026
Lac du Flambeau Tribe
Close: Apr 30, 2026
Work includes approx 324 LF of 36W" prestressed girder type 1; 250 LF of railing tubular Type M; 1,150 LF of 14x0.50" piling CIP concrete; 174 LF of 6" pipe underdrain; 2,239 CY of borrow; 23,420 LB of bar steel reinforcement HS structures.
AvailableLac du Flambeau Tribe
Seeking from qualified, reputable A&E firms to develop a Master Plan for management of and septage disposal for the approximately 310 private onsite wastewater treatment systems located at Tribal residences not connected to or served by the Tribe’s wastewater treatment facility. Tribal members must currently rely upon private purveyors of septic pumping services, and consistency and reliability of such services have been long-standing issues. As a result, the Tribe would like to develop its own system to manage POWTS septage disposal in a sustainable and environmentally friendly manner.
Posted Date
Mar 12, 2026
Due Date
Apr 15, 2026
Release: Mar 12, 2026
Lac du Flambeau Tribe
Close: Apr 15, 2026
Seeking from qualified, reputable A&E firms to develop a Master Plan for management of and septage disposal for the approximately 310 private onsite wastewater treatment systems located at Tribal residences not connected to or served by the Tribe’s wastewater treatment facility. Tribal members must currently rely upon private purveyors of septic pumping services, and consistency and reliability of such services have been long-standing issues. As a result, the Tribe would like to develop its own system to manage POWTS septage disposal in a sustainable and environmentally friendly manner.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Lac du Flambeau Tribe's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database