Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Bad River Band
Directionally boring approx., 13,200 of 8" hdpe water main, with fire hydrants, valves, and appurtenances. Construct 30' by 30' pumphouse with plumbing tree, controls, and chemical feed. Emergency generator. Two pressure reducing valves with vaults.
Posted Date
May 29, 2026
Due Date
Jun 18, 2026
Release: May 29, 2026
Bad River Band
Close: Jun 18, 2026
Directionally boring approx., 13,200 of 8" hdpe water main, with fire hydrants, valves, and appurtenances. Construct 30' by 30' pumphouse with plumbing tree, controls, and chemical feed. Emergency generator. Two pressure reducing valves with vaults.
AvailableBad River Band
Clear and grub project site (approx. , 130' by 170'). Connect new water storage structure to existing water distribution system. Construct 60'x60' chain link security perimeter fencing around new tower location. Provide gravel access drive and parking to new water storage structure. Provide new water storage structure with supervisory control. Final grading and site restoration of all locations disturbed by construction activities. Complete demolition and removal of existing water storage structures: one (1) 40,000- gallon single pedestal elevated water storage tank. One (1) 75,000 - gallon single pedestal elevated water storage tank. Final grading and site restoration of all locations disturbed by demolition activities.
Posted Date
May 29, 2026
Due Date
Jun 18, 2026
Release: May 29, 2026
Bad River Band
Close: Jun 18, 2026
Clear and grub project site (approx. , 130' by 170'). Connect new water storage structure to existing water distribution system. Construct 60'x60' chain link security perimeter fencing around new tower location. Provide gravel access drive and parking to new water storage structure. Provide new water storage structure with supervisory control. Final grading and site restoration of all locations disturbed by construction activities. Complete demolition and removal of existing water storage structures: one (1) 40,000- gallon single pedestal elevated water storage tank. One (1) 75,000 - gallon single pedestal elevated water storage tank. Final grading and site restoration of all locations disturbed by demolition activities.
AvailableBad River Band
Work consists of installation of a mixer in 200,000-gal elevated water storage tank along with electrical supply and controls.
Posted Date
Apr 13, 2026
Due Date
May 7, 2026
Release: Apr 13, 2026
Bad River Band
Close: May 7, 2026
Work consists of installation of a mixer in 200,000-gal elevated water storage tank along with electrical supply and controls.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge