Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Lac Courte Oreilles's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Lac Courte Oreilles
Project consists of new natural gas back-up generator, automatic transfer switch, all associated electrical, and appurtenances. Work also includes chain-link fencing, installation of bollards, and finish site grading. Rehabilitation and replacement of fire hydrants and gate valves at approximately 24 locations throughout the community water system. See outside link.
Posted Date
Mar 19, 2025
Due Date
Apr 8, 2025
Release: Mar 19, 2025
Lac Courte Oreilles
Close: Apr 8, 2025
Project consists of new natural gas back-up generator, automatic transfer switch, all associated electrical, and appurtenances. Work also includes chain-link fencing, installation of bollards, and finish site grading. Rehabilitation and replacement of fire hydrants and gate valves at approximately 24 locations throughout the community water system. See outside link.
Lac Courte Oreilles
Installation of new controls with programming, back-up generator with ATS, chain-link fencing, safety grate, and pump lift/hoist for an existing lift station. Removal of existing sewer force main and installation of approx. 60 LF of new force main, one (1) bypass tee, and two (2) gate valves with box. Removal of existing Air Release Valves (ARVs) and installation of five (5) combination air release valves. Provision of two (2) spare ARVs. Removal of existing concrete manhole structure and installation of one (1) concrete manhole structure with bypass apparatus. Installation of insulation over existing force main.
Posted Date
Aug 30, 2024
Due Date
Sep 25, 2024
Release: Aug 30, 2024
Lac Courte Oreilles
Close: Sep 25, 2024
Installation of new controls with programming, back-up generator with ATS, chain-link fencing, safety grate, and pump lift/hoist for an existing lift station. Removal of existing sewer force main and installation of approx. 60 LF of new force main, one (1) bypass tee, and two (2) gate valves with box. Removal of existing Air Release Valves (ARVs) and installation of five (5) combination air release valves. Provision of two (2) spare ARVs. Removal of existing concrete manhole structure and installation of one (1) concrete manhole structure with bypass apparatus. Installation of insulation over existing force main.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.