Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Complete improvements to an existing 136’ tall 250,000-gallon steel pedestal elevated spheroid water storage tank, including but not limited to: 1. Remove existing insulation and coating system from exterior and apply new coating system, including logo. 2. Remove existing coating system from interior wet and apply new coating system. 3. Remove existing insulation and coating system from interior dry sweat areas (dry access tube and bowl) and apply new coating system. 4. Remove existing coating system from interior dry riser pipe, platforms (3 total), and stem above top platform, and apply new coating system. Aluminum jacketing and insulation shall be removed from riser pipe to perform the work and reinstalled after the new coating system is applied. 5. Recondition interior dry non-sweat coating system by performing spot repairs to damaged areas. 6. Install a mixer system in the interior wet, with control panel installed in the heated enclosure. 7. Remove existing heated enclosure in base bell and construct a new heated enclosure, including concrete flatwork. 8. Perform other miscellaneous tower improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of construction of a fire protection water system water storage tank improvements.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Work consists of construction of a fire protection water system water storage tank improvements.
AvailableRelease: Dec 5, 2025
Close: Jan 15, 2026
Elevated water storage tank.
AvailableThe proposed project consists of the installation of one (1) new 153,000 gallon water storage tank and foundation, general site grading, valve vault, site piping, site stone, chain link fence, hydrodynamic mixing system, gravel access road improvements, and other necessary appurtenances.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Close: Dec 17, 2025
The proposed project consists of the installation of one (1) new 153,000 gallon water storage tank and foundation, general site grading, valve vault, site piping, site stone, chain link fence, hydrodynamic mixing system, gravel access road improvements, and other necessary appurtenances.
AvailableWater treatment plant improvements building and storage tank construction.
Posted Date
Dec 12, 2025
Due Date
Jan 8, 2026
Release: Dec 12, 2025
Close: Jan 8, 2026
Water treatment plant improvements building and storage tank construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis