St Bernard DWRLF Waterline Replacement Project 3.3 RFP
Posted
Sep 2, 2026
Sep 29, 2026
Work of this project includes replacement of existing water lines. The existing water lines along these streets are to be replaced with 4" and 8" water line. The existing water lines are to be capped and/or abandoned in-place per plan locations. The contract shall be constructed complete in place with all valves, hydrants, fittings, services and restoration of roadway, sidewalks, driveways, established lawns, and roadway drainage ditches to original conditions.
