Construction of an New Gymnasium and Cafeteria RFP
Aug 7, 2026
Closes
Sep 1, 2026
Work includes demolition, Sitework, concrete, PEMB with standing seam metal roof, metal studs, masonry veneer exterior, CMU, insulation and sealants, miscellaneous structural steel, millwork, hollow metal doors, frames, wood doors, and hardware, aluminum storefronts & windows, ceramic tile, rubber base, glass and glazing, sealed and polished concrete, painting and finishing, drywall, acoustical ceilings, kitchen appliances and equipment, wood gym floor system, various specialty items, athletic equipment, fixed and telescopic bleachers, fire suppression and alarms, elevator, plumbing, HVAC, and electrical.
