Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Shrewsbury Electric & Cable Operations (SELCO)'s meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Shrewsbury Electric & Cable Operations (SELCO)
Seeks sealed bids for "As Needed Various Underground Construction Cable/Fiber" to be provided on a non-exclusive, as needed basis.
Posted Date
Jan 28, 2026
Due Date
Feb 19, 2026
Release: Jan 28, 2026
Shrewsbury Electric & Cable Operations (SELCO)
Close: Feb 19, 2026
Seeks sealed bids for "As Needed Various Underground Construction Cable/Fiber" to be provided on a non-exclusive, as needed basis.
AvailableShrewsbury Electric & Cable Operations (SELCO)
Fiber to the Premises (FTTP) Network Upgrade within a designated node, Phase 2: The Project includes all labor, material, and equipment to complete and install a fully functioning Fiber Network and associated installation of the following: 1.Signal transmission lateral fiber optic cable(s) from SELCO's existing Backbone fiber ring to each of the identified splitter cabinets. 2.Signal distribution lateral fiber optic cable(s) from the identified splitter cabinets to the predetermined fiber access point public right of way locations as indicated on the design drawings. 3.Fiber optic cable splicing along with pre, and post installation testing of all fiber installed throughout the network.
Posted Date
Feb 21, 2025
Due Date
Mar 20, 2025
Release: Feb 21, 2025
Shrewsbury Electric & Cable Operations (SELCO)
Close: Mar 20, 2025
Fiber to the Premises (FTTP) Network Upgrade within a designated node, Phase 2: The Project includes all labor, material, and equipment to complete and install a fully functioning Fiber Network and associated installation of the following: 1.Signal transmission lateral fiber optic cable(s) from SELCO's existing Backbone fiber ring to each of the identified splitter cabinets. 2.Signal distribution lateral fiber optic cable(s) from the identified splitter cabinets to the predetermined fiber access point public right of way locations as indicated on the design drawings. 3.Fiber optic cable splicing along with pre, and post installation testing of all fiber installed throughout the network.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.