Design Services: 2000 GPM Deep Well - SW Quad (Request For Proposal)
Posted
Nov 5, 2026
Dec 9, 2026
Design build of a new 2,000 gallon per minute (gpm) production well. The parcel currently contains an operational 0. 6 million gallon (mg) elevated storage tank that was constructed to provide fire protection and potable water storage for the southwest quad area also inludes consulting engineering firm to provide professional engineering services and construction administration services for the 2,000 gpm deep well project.



