Avondale Avenue Asbestos Cement Water Main Replacement
Aug 22, 2026
Closes
Sep 16, 2026
Work includes erosion control, traffic control, 214 SY removal and preparation of base for flexible pavement, 214 SY bituminous wearing surface, 7 SY replacement of gravel driveways (6" thick), 16 SY replacement of concrete (4" thick), 214 SY temporary asphalt patch, 1,655 LF " pvc water main (c900, dr25), 1 EA 6" x 6" anchor tee. See attached file.
