Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across San Juan Water District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
President
General Manager
Treasurer
Premium
Access the largest public sector contact database
Active opportunities open for bidding
San Juan Water District
The San Juan Water District is soliciting consulting engineering services to investigate, design, and provide bidding and construction support for an Air Release Valve Replacement Program that will replace approximately 45 valves per year over a three-year program and evaluate up to 60 valves each year. The consultant will perform investigation and evaluation, prepare preliminary and final design plans and specifications, and provide bidding and construction support services. The solicitation is open for proposals from 2026-01-05 through 2026-02-04 and includes a mandatory pre-bid meeting on 2026-01-15.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
San Juan Water District
Close: Feb 4, 2026
The San Juan Water District is soliciting consulting engineering services to investigate, design, and provide bidding and construction support for an Air Release Valve Replacement Program that will replace approximately 45 valves per year over a three-year program and evaluate up to 60 valves each year. The consultant will perform investigation and evaluation, prepare preliminary and final design plans and specifications, and provide bidding and construction support services. The solicitation is open for proposals from 2026-01-05 through 2026-02-04 and includes a mandatory pre-bid meeting on 2026-01-15.
AvailableSan Juan Water District
Work involves the construction of domestic (potable) water facilities including but not limited to water services, fire hydrants, air release valves, and blow-offs. The work consists of providing all labor, materials and equipment for the replacement of replacement of 82 water services, 6 fire hydrants, 1 air release valve, and a blowoff in the hidden lakes subdivisions 1 & 2.
Posted Date
Aug 11, 2025
Due Date
Sep 8, 2025
Release: Aug 11, 2025
San Juan Water District
Close: Sep 8, 2025
Work involves the construction of domestic (potable) water facilities including but not limited to water services, fire hydrants, air release valves, and blow-offs. The work consists of providing all labor, materials and equipment for the replacement of replacement of 82 water services, 6 fire hydrants, 1 air release valve, and a blowoff in the hidden lakes subdivisions 1 & 2.
San Juan Water District
Work include demolition of a 2,318 SF composite deck, footings and railings and the construction of a new concrete patio of nearly the same dimensions, a 35 x38 wood patio cover, shade sails and post supports, the replacement of a gravity sewer pipeline, and site drainage improvements.
Posted Date
Jul 11, 2025
Due Date
Aug 5, 2025
Release: Jul 11, 2025
San Juan Water District
Close: Aug 5, 2025
Work include demolition of a 2,318 SF composite deck, footings and railings and the construction of a new concrete patio of nearly the same dimensions, a 35 x38 wood patio cover, shade sails and post supports, the replacement of a gravity sewer pipeline, and site drainage improvements.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.