Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
University or college mascot.
Full-time equivalent employees.
Graduation rate percentage.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Sampson Community College
Sampson Community College is seeking professional services for construction testing and commissioning for a new 36,084 square foot, two-story nursing building. Firms must provide separate qualifications for either construction testing or commissioning agent services and clearly indicate their choice in the proposal package. The project has an estimated value of approximately $18.4 million and responses are due by late March 2026.
Posted Date
Mar 3, 2026
Due Date
Mar 26, 2026
Release: Mar 3, 2026
Sampson Community College
Close: Mar 26, 2026
Sampson Community College is seeking professional services for construction testing and commissioning for a new 36,084 square foot, two-story nursing building. Firms must provide separate qualifications for either construction testing or commissioning agent services and clearly indicate their choice in the proposal package. The project has an estimated value of approximately $18.4 million and responses are due by late March 2026.
AvailableSampson Community College
Construction of a new two-story, 36,048 GSF Nursing and Allied Health Building.2.This includes several specialized labs spaces, including nursing, nurses aid, medical assisting, phlebotomy, surgical tech, and pharmacy. Several simulation labs are included in the design, including an EMS lab, Emergency Room lab, medical office, and residential lab. A covered drive-thru area adjacent to the simulated EMS and emergency rooms labs is in place to allow ambulatory access to the building and mimic real-world conditions for students. All spaces are supported by storage rooms for specialized tools and materials.3.General purpose classrooms, faculty offices, conferencing space, restrooms, vending, and a lobby are included.4.The new Building will be a Business (B) occupancy (Education above the 12th Grade), Type IIB Construction, and fully sprinklered.5.We anticipate using a steel structural framing system with roof bar joists and metal decking covered with 6” rigid insulation and a standing seam metal roof.6.Exterior walls will be brick veneer with a cavity for drainage, rigid insulation over either CMU or cold-formed metal framing as the inner wall. Shop areas will have the CMU, while classrooms and offices areas will use metal studs. Exterior metal wall panels will be utilized in lieu of brick in higher wall areas. Exterior walls will be non-load bearing.7.Interior walls will be CMU in Shop areas and metal stud with gypsum wall systems elsewhere.8.The interior shall have all new partitions and highly durable finish systems, plumbing, HVAC, and Electrical power, Lights, and data wiring. 9.The building will be protected by anew fire alarm system and be fully sprinklered. A fire pumps is included.10.New pedestrian walkway system and lighting will be required as indicated. Some hardscaping is designed along the exterior of the building.11.New domestic and fire lines will need to be extended to the building. A new gravity sewer line to tie into the existing is required. New electrical service will be required. A transformer for the building will be fed from the main transformer at Road and master metered. 12.New plumbing,HVAC, and Electrical Systems are required.13.Multiple Alternate Bids will be considered.
Posted Date
-
Due Date
Mar 3, 2026
Sampson Community College
Close: Mar 3, 2026
Construction of a new two-story, 36,048 GSF Nursing and Allied Health Building.2.This includes several specialized labs spaces, including nursing, nurses aid, medical assisting, phlebotomy, surgical tech, and pharmacy. Several simulation labs are included in the design, including an EMS lab, Emergency Room lab, medical office, and residential lab. A covered drive-thru area adjacent to the simulated EMS and emergency rooms labs is in place to allow ambulatory access to the building and mimic real-world conditions for students. All spaces are supported by storage rooms for specialized tools and materials.3.General purpose classrooms, faculty offices, conferencing space, restrooms, vending, and a lobby are included.4.The new Building will be a Business (B) occupancy (Education above the 12th Grade), Type IIB Construction, and fully sprinklered.5.We anticipate using a steel structural framing system with roof bar joists and metal decking covered with 6” rigid insulation and a standing seam metal roof.6.Exterior walls will be brick veneer with a cavity for drainage, rigid insulation over either CMU or cold-formed metal framing as the inner wall. Shop areas will have the CMU, while classrooms and offices areas will use metal studs. Exterior metal wall panels will be utilized in lieu of brick in higher wall areas. Exterior walls will be non-load bearing.7.Interior walls will be CMU in Shop areas and metal stud with gypsum wall systems elsewhere.8.The interior shall have all new partitions and highly durable finish systems, plumbing, HVAC, and Electrical power, Lights, and data wiring. 9.The building will be protected by anew fire alarm system and be fully sprinklered. A fire pumps is included.10.New pedestrian walkway system and lighting will be required as indicated. Some hardscaping is designed along the exterior of the building.11.New domestic and fire lines will need to be extended to the building. A new gravity sewer line to tie into the existing is required. New electrical service will be required. A transformer for the building will be fed from the main transformer at Road and master metered. 12.New plumbing,HVAC, and Electrical Systems are required.13.Multiple Alternate Bids will be considered.
Sampson Community College
Construction of a new two-story, 36,048 GSF Nursing and Allied Health Building.2.This includes several specialized labs spaces, including nursing, nurses aid, medical assisting, phlebotomy, surgical tech, and pharmacy. Several simulation labs are included in the design, including an EMS lab, Emergency Room lab, medical office, and residential lab. A covered drive-thru area adjacent to the simulated EMS and emergency rooms labs is in place to allow ambulatory access to the building and mimic real-world conditions for students. All spaces are supported by storage rooms for specialized tools and materials.3.General purpose classrooms, faculty offices, conferencing space, restrooms, vending, and a lobby are included.4.The new Building will be a Business (B) occupancy (Education above the 12th Grade), Type IIB Construction, and fully sprinklered.5.We anticipate using a steel structural framing system with roof bar joists and metal decking covered with 6” rigid insulation and a standing seam metal roof.6.Exterior walls will be brick veneer with a cavity for drainage, rigid insulation over either CMU or cold-formed metal framing as the inner wall. Shop areas will have the CMU, while classrooms and offices areas will use metal studs. Exterior metal wall panels will be utilized in lieu of brick in higher wall areas. Exterior walls will be non-load bearing.7.Interior walls will be CMU in Shop areas and metal stud with gypsum wall systems elsewhere.8.The interior shall have all new partitions and highly durable finish systems, plumbing, HVAC, and Electrical power, Lights, and data wiring. 9.The building will be protected by anew fire alarm system and be fully sprinklered. A fire pumps is included.10.New pedestrian walkway system and lighting will be required as indicated. Some hardscaping is designed along the exterior of the building.11.New domestic and fire lines will need to be extended to the building. A new gravity sewer line to tie into the existing is required. New electrical service will be required. A transformer for the building will be fed from the main transformer at Road and master metered. 12.New plumbing,HVAC, and Electrical Systems are required.13.Multiple Alternate Bids will be considered.
Posted Date
-
Due Date
Mar 3, 2026
Sampson Community College
Close: Mar 3, 2026
Construction of a new two-story, 36,048 GSF Nursing and Allied Health Building.2.This includes several specialized labs spaces, including nursing, nurses aid, medical assisting, phlebotomy, surgical tech, and pharmacy. Several simulation labs are included in the design, including an EMS lab, Emergency Room lab, medical office, and residential lab. A covered drive-thru area adjacent to the simulated EMS and emergency rooms labs is in place to allow ambulatory access to the building and mimic real-world conditions for students. All spaces are supported by storage rooms for specialized tools and materials.3.General purpose classrooms, faculty offices, conferencing space, restrooms, vending, and a lobby are included.4.The new Building will be a Business (B) occupancy (Education above the 12th Grade), Type IIB Construction, and fully sprinklered.5.We anticipate using a steel structural framing system with roof bar joists and metal decking covered with 6” rigid insulation and a standing seam metal roof.6.Exterior walls will be brick veneer with a cavity for drainage, rigid insulation over either CMU or cold-formed metal framing as the inner wall. Shop areas will have the CMU, while classrooms and offices areas will use metal studs. Exterior metal wall panels will be utilized in lieu of brick in higher wall areas. Exterior walls will be non-load bearing.7.Interior walls will be CMU in Shop areas and metal stud with gypsum wall systems elsewhere.8.The interior shall have all new partitions and highly durable finish systems, plumbing, HVAC, and Electrical power, Lights, and data wiring. 9.The building will be protected by anew fire alarm system and be fully sprinklered. A fire pumps is included.10.New pedestrian walkway system and lighting will be required as indicated. Some hardscaping is designed along the exterior of the building.11.New domestic and fire lines will need to be extended to the building. A new gravity sewer line to tie into the existing is required. New electrical service will be required. A transformer for the building will be fed from the main transformer at Road and master metered. 12.New plumbing,HVAC, and Electrical Systems are required.13.Multiple Alternate Bids will be considered.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
Sampson Community College
This document is a Purchase Order from Sampson Community College to Blackbaud Inc. for Raiser Edge Software and Financial Edge Software for the 2025-2026 period. The total cost for this software is $14,438.15.
Effective Date
Jan 1, 2025
Expires
Effective: Jan 1, 2025
Sampson Community College
Expires:
This document is a Purchase Order from Sampson Community College to Blackbaud Inc. for Raiser Edge Software and Financial Edge Software for the 2025-2026 period. The total cost for this software is $14,438.15.
AvailableSee expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Sampson Community College
The discussion centered on the college's funding sources, including state funds, institutional money (federal pass-through grants), and county funding. State funds constitute the largest portion, followed by institutional money primarily for student scholarships and grants, and county funding for maintaining properties. The total operating budget was mentioned. The county commissioners were asked for additional funding to repair roadways, parking lots, and replace a roof. The foundation's role in supporting students and the college's mission, such as developing the East project, was also discussed.
The annual foundation meeting included discussions on financials, minutes, successes, and challenges. The agenda included passing a new budget and welcoming new members to the Foundation Board, while also acknowledging the departure of longtime directors. The foundation serves as the principal source of scholarship money and provides significant resources for students. It also supports campus expansion and enhancements.
Sampson Community College's (SCC) Board of Trustees meeting highlighted the significant growth of the Electrical and HVAC programs, exceeding 200% in FTE over five years. The success is attributed to innovative scheduling and dedicated faculty. The board also approved the application for a new Applied Engineering Technology degree program, which will proceed to the state board for final approval.
The 2022-2025 Strategic Plan for Sampson Community College focuses on three main themes: Effectiveness, Engagement, and Excellence. Effectiveness goals center on improving teaching and learning through innovative methods, enhancing student support services, and optimizing resource utilization. Engagement goals aim to increase student, employee, and community involvement. Excellence goals target improved student outcomes, employee development, and campus infrastructure. The plan addresses challenges such as declining enrollment, workforce demands, and resource constraints, while emphasizing the college's mission to provide accessible and affordable education, workforce training, and lifelong learning opportunities.
The Sampson Community College (SCC) 2023-2027 Master Facilities Plan outlines a comprehensive strategy for campus development, encompassing new construction, renovations, additions, and infrastructure improvements. The plan prioritizes efficient use of existing buildings and enhances the student experience through modernization and consolidation. Key projects include a new North Building-Kitchin Building Connector, an Activity Building addition, a new Allied Health and Nursing Building, a new Cosmetology and Barbering Building, renovation and repurposing of the Technology Building for the Early College High School, renovation of the Warren Building, and a new Burn Tower at the SCC Annex. Longer-term projects include a new Buildings and Grounds facility, a Public Safety Complex, and renovations to the North and Kitchin Buildings. The plan aims to create a safe, pedestrian-friendly campus and improve the overall student experience.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Sampson Community College's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Director of Information Technology/Chief Information Officer
Vice President of Workforce Development & Continuing Education
Premium
Access the largest public sector contact database