Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Rumford Mexico Sewer District
Rumford-Mexico Sewerage District is soliciting bids for Phase 1 upgrades to its Wastewater Treatment Facility in Mexico, Maine. The work includes upgrades to headworks grit processing, septage receiving, secondary clarifiers, sludge systems, demolition of two bio‑oxidation towers, renovation of the Operations Building, construction of a new Maintenance Building, and instrumentation and electrical upgrades, with a pre‑bid meeting on March 11, 2026. Bids are due April 16, 2026 at 2:00 PM (2026‑04‑16T18:00:00Z).
Posted Date
-
Due Date
Apr 16, 2026
Rumford Mexico Sewer District
Close: Apr 16, 2026
Rumford-Mexico Sewerage District is soliciting bids for Phase 1 upgrades to its Wastewater Treatment Facility in Mexico, Maine. The work includes upgrades to headworks grit processing, septage receiving, secondary clarifiers, sludge systems, demolition of two bio‑oxidation towers, renovation of the Operations Building, construction of a new Maintenance Building, and instrumentation and electrical upgrades, with a pre‑bid meeting on March 11, 2026. Bids are due April 16, 2026 at 2:00 PM (2026‑04‑16T18:00:00Z).
AvailableRumford Mexico Sewer District
Provide upgrades to the pump station's treatment systems including headworks, pumping system, SCADA, and ancillary equipment.
Posted Date
Apr 25, 2025
Due Date
Jun 3, 2025
Release: Apr 25, 2025
Rumford Mexico Sewer District
Close: Jun 3, 2025
Provide upgrades to the pump station's treatment systems including headworks, pumping system, SCADA, and ancillary equipment.
Rumford Mexico Sewer District
Work include construct waste water treatment facility upgrade complete with all appurtenances; concrete repair to existing concrete tank and structure 500 SF; crack repair to existing concrete tank and structure 200 LF; secondary clarifier to done support piers 24 EA; additional earth work- excavation and disposal and replacement back-fill 300 CY; ledge excavation and disposal 200 CY; bulk product waste disposal 50 TN; treatment structure griy/sludge/rags/ solids/debris removal.
Posted Date
-
Due Date
Feb 4, 2025
Rumford Mexico Sewer District
Close: Feb 4, 2025
Work include construct waste water treatment facility upgrade complete with all appurtenances; concrete repair to existing concrete tank and structure 500 SF; crack repair to existing concrete tank and structure 200 LF; secondary clarifier to done support piers 24 EA; additional earth work- excavation and disposal and replacement back-fill 300 CY; ledge excavation and disposal 200 CY; bulk product waste disposal 50 TN; treatment structure griy/sludge/rags/ solids/debris removal.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Rumford Mexico Sewer District
The meeting included a review of the Finance section, noting that the operating budget is performing well through January, with current CDAR interest earnings between $3k and $4k. Capital Project updates included equipment arriving for the Dix Ave project, with an expected start date of April 2026, and a halt in the bid process for the Main Plant (Phase 1) pending State Fire Marshall review of design drawings. The Board approved the purchase of a storage container for capital projects for $10,090.45. Key legal actions involved authorizing the issuance of a Revenue Obligation Bond for $2,710,000.00 and directing the Treasurer and Chair to apply for a corresponding loan from the Maine Municipal Bond Bank. Operational updates covered maintenance performed at the Main Plant, including seal replacement on RSP #1, and upcoming tours related to sludge disposal aimed at eliminating PFAs.
The Special Meeting for Emergency Repair to Morse Bridge focused on approving bids for necessary repair work on the sewer pipe located on the side of Morse Bridge. The Board unanimously accepted the Maine DOT bid for insulation work at a cost of $10,500 +/- and the Insituform LLC bid for pipe relining at a cost of $97,000 +/-. Funding for these expenses will be sourced from line items 5023 and 5027, with any remainder covered by septic receiving funds.
The agenda for the meeting included several key discussions across various committees. The Personnel committee planned discussion regarding the managerial role. The Finance committee was scheduled to review septage receiving, the current operating budget status, and the Capital Project status, specifically Phase 1 planning for the Main Plant (with engineering amendment completed) and the purchase of a storage container for the Capital Project. The Legal committee was set to discuss two matters with the Bond Council concerning Androscoggin BANs: the expiration of a $2.5 MM BAN and the creation of a $10.77 MM BAN. Operations items included updates on compliance, mechanical seal failure and repair on RSP #1 at the Main Plant, installation of a new exhaust fan motor, and receipt of the Muffin Monster. Trucking costs for sludge disposal were also on the agenda. The Collection System report indicated refurbishment of three manholes along Route 2 in Rumford with new flood covers, and a plan to line a manhole below the memorial bridge in 2026.
Key discussions during the meeting included the review of the 2024 single audit, which showed no issues, and the unanimous approval of the 2026 fiscal year budget. The Finance section also noted recent septage revenue and updates on insurance, specifically securing flood insurance for Dix Avenue and obtaining a new workers' compensation carrier. Updates on capital projects covered the Dix Avenue Project and plans for Phase 1 of the Main Plant project. Legal matters addressed the upcoming retirement of the bond council representative and a transition meeting with the successor. Operational reviews confirmed good performance at the Main Plant and Rumford Point Plant, an extension of the sludge disposal contract, and troubleshooting radar issues at the South Rumford pump station. Finally, plans were made to repair four manholes in early December.
The meeting addressed personnel matters, including approving employee participation in a MEWA Management Training Course. Financial discussions covered septage revenues, the current operating budget, and approval of quotes for manhole relining and digester tank cleaning. The board also approved an annual maintenance contract from Milton Cat and discussed a FEMA Disaster Relief claim related to an insurance claim filed for an event on May 1st. Legal matters included authorizing Preti Flaherty to conduct deed work to find all deeds and right of ways for the district. Operational updates included reports on permit violations, the status of the Rumford Point Plant, pump stations, and collection system inspections.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Rumford Mexico Sewer District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database