Primary Influent Pump Station (PIPS) Parallel Force Main Project
Jul 29, 2026
Closes
Sep 3, 2026
Installation of approx. 13,000LF of 42" High-Density Polyethylene (HDPE) pipe via open cut and trenchless construction methods, construction of a flow split valve vault, pavement surface restoration, implementation of a bypass pumping system, construction of a 10-ft wide approx. 2,000ft long concrete pathway, and other items associated with the project.