Construction of 9.295 Miles of Maintenance (other Than Bridge)
Jul 30, 2026
Closes
Sep 1, 2026
Work inlcudes 1,424 LF removal of existing traffic stripe; 668 CY unclassified excavation (fm); 7,805 TN asphalt, st, 9.5mm; 668 TN crushed stone (size 610); 5,173 TN asphalt, st, 9.5mm; 661 TN asphalt, st, 12.5mm (base repair); 473 TN asphalt, st, 9.5mm (leveling); 1,666 SY cold milling of bituminous pavement, all depths; 265 CY blotter material (lvm); 0.135 mi 4"-wide cold-plastic edge stripe (continuous white); 712 LF 4"-wide cold-plastic traffic stripe (continuous yellow); 18.612 mi 4"-wide thermoplastic edge stripe (continuous white) (60 mils); 92,893 LF 4"-wide thermoplastic traffic stripe (continuous yellow) (90 mils).