Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Peabody Municipal Light Plant (PMLP)
This RFP is for the replacement and upgrade of existing 115-23 kV substation equipment and site infrastructure at the Bartholomew Street Substation, encompassing civil work, equipment removal, new equipment installation, grounding, cable work, yard lighting, fencing, and transformer painting.
Posted Date
Jul 3, 2026
Due Date
Aug 6, 2026
Release: Jul 3, 2026
Peabody Municipal Light Plant (PMLP)
Close: Aug 6, 2026
This RFP is for the replacement and upgrade of existing 115-23 kV substation equipment and site infrastructure at the Bartholomew Street Substation, encompassing civil work, equipment removal, new equipment installation, grounding, cable work, yard lighting, fencing, and transformer painting.
AvailablePeabody Municipal Light Plant (PMLP)
The Town of Wellesley Municipal Light Plant in Massachusetts is inviting bids for the supply of five Tank Switches rated at 15kV, 3-phase, 200A with 3-way load-break capability, per Specification #26E-06-12. The solicitation (BD-26-1344-00490-00490-130721) was posted on COMMBUYS, the official Massachusetts state procurement portal, and bids must be received by July 28, 2026 at 1:30 PM. Interested bidders must contact tleung@wellesleyma.gov to receive the complete bid specification document.
Posted Date
Jun 18, 2026
Due Date
Jul 28, 2026
Release: Jun 18, 2026
Peabody Municipal Light Plant (PMLP)
Close: Jul 28, 2026
The Town of Wellesley Municipal Light Plant in Massachusetts is inviting bids for the supply of five Tank Switches rated at 15kV, 3-phase, 200A with 3-way load-break capability, per Specification #26E-06-12. The solicitation (BD-26-1344-00490-00490-130721) was posted on COMMBUYS, the official Massachusetts state procurement portal, and bids must be received by July 28, 2026 at 1:30 PM. Interested bidders must contact tleung@wellesleyma.gov to receive the complete bid specification document.
AvailablePeabody Municipal Light Plant (PMLP)
The Town of Wellesley Municipal Light Plant is soliciting bids to furnish three Tank Switches (15kV, 3-phase, 600A, 2-way load-break) per Specification #26E-04-20. Bids are to be submitted via the buyer’s procurement portal and the bid opening is scheduled for June 2, 2026 at 1:30 PM. This is an open market Invitation for Bid for equipment procurement with an estimated budget range of approximately $30,000–$150,000.
Posted Date
Apr 16, 2026
Due Date
Jun 2, 2026
Release: Apr 16, 2026
Peabody Municipal Light Plant (PMLP)
Close: Jun 2, 2026
The Town of Wellesley Municipal Light Plant is soliciting bids to furnish three Tank Switches (15kV, 3-phase, 600A, 2-way load-break) per Specification #26E-04-20. Bids are to be submitted via the buyer’s procurement portal and the bid opening is scheduled for June 2, 2026 at 1:30 PM. This is an open market Invitation for Bid for equipment procurement with an estimated budget range of approximately $30,000–$150,000.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Peabody Municipal Light Plant (PMLP)
The meeting featured the introduction of a student representative and reports from the Manager regarding Northeast Public Power Association committee appointments, the Inclusive Utility Investment pilot program, and a request for information process for power supply. Key business included the awarding of a contract for steel tower repair and painting, a presentation on a battery storage system concept by Kearsarge, and a discussion regarding battery storage charging rates. Additionally, the commission deliberated on and ultimately rescinded two prior motions concerning a hiring freeze and the hiring of a law firm for contract review, with plans to revisit these topics in future meetings.
The Commission discussed several operational and financial items, including the introduction of new employees and an update on the deposit refund process. The 2026 budget was amended and approved, and the appointment of an alternative voting representative for the Massachusetts Municipal Utility Self-Insurance Trust was confirmed. The Commission received an update on the organizational review being conducted by BDO USA and passed a motion to implement a hiring freeze until the review is complete. Additionally, a motion was passed to hire a law firm specializing in utility law to review the contractual agreement with MMWEC. Performance updates on generation assets were provided, and a Commissioner reported on a legislative rally attended in Washington D.C.
This document outlines PMLP's commitment to environmental sustainability and its strategic path to achieving 100% net-zero carbon emissions by 2050. The plan emphasizes balancing environmental goals with providing safe, reliable, and affordable electricity to customers. Key strategic areas include diversifying the power supply with carbon-free sources and adhering to a detailed decarbonization timeline, which includes interim net-zero requirements for 2030 and 2040, while maintaining high-quality service and low rates.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Peabody Municipal Light Plant (PMLP)'s board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge