Drainage District Open Ditch Repairs RFP
Aug 11, 2026
Closes
Sep 1, 2026
Approximately 6,500 linear feet (LF) of bank shaping, 1,500 LF of eroded sediment relocation (channel excavation), 5,500 LF of bank shaping under riprap, furnishing and installing 5,500 tons of riprap, furnishing and placing 190 cubic yards (CY) of fill, furnishing and installing 564 LF of corrugated metal pipe (CMP) tile outlets and surface drain pipes ranging from 12” to 54” in diameter, and 12,000 LF of seeding & fertilizing disturbed ditch banks.
