2027 Sidewalk, Curb and Gutter RFP
Posted
Nov 5, 2026
Dec 3, 2026
Work consist of 20,514 sf of sidewalk, 143 sf of sidewalk remove only, 155 sf of brick/paver specialty finishes, 1,953 sf of driveway, 525 lf of type a curb, 2,703 sf of gutter pan, 36 ea of curb ramp, 2,205 sf of ac pavement, 5 ea of reset catch basin.



