Blower Building Airline Modifications Project
Aug 20, 2026
Closes
Sep 15, 2026
Abandonment and grouting of the existing underground airline and construction of a new above-ground airline at the Sewer Treatment Plant in the Borough. The airline will be mounted to the outside of the blower building and connect to package plants A and B equipped with valves, joints and supports.
