CityNJ
Posted
Nov 16, 2026
Dec 15, 2026
Description: Wastewater vactoring services, including labor, equipment, and materials for routine cleaning and maintenance of the collection system and sewer treatment plant during 2027.
City · NJ, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Borough of Palmyra.
Adjacent opportunities open for bidding right now.
CityNJ
Posted
Nov 16, 2026
Dec 15, 2026
Maintenance of the Borough of Palmyra Sewer Treatment Plant and Collection System for 2027.
CityIN
Posted
Oct 20, 2026
Nov 23, 2026
Project includes improvements to the Town's existing wastewater treatment plant (WWTP) and collection system. The WWTP work includes but is not limited to headworks improvements: new in-channel articulating rake screen and manual bypass bar screen, ancillary structure modifications to reinforced concrete structure, grating, handrail and platform; aerated cell lagoon improvements: sludge removal, hauling and disposal, new floating aerators, new controls; replacement of clarifier tank plug valves, replacement of chlorine contact tank drain valve, new influent and effluent samplers and all other work required for the completion of WWTP improvements. The collection system work includes but is not limited to upgrading Lift Station #1, new submersible pumps, new monitoring and control package with VFDs and all lift station accessories for a complete operational pump system. The existing valve vault work includes replacement of check valves. Additional work includes bypass pumping, electrical utility coordination, perimeter fence installation and all other work required for the completion of the lift station improvements.
Fitchburg Redevelopment Authority (FRA)
Special DistrictMA
Posted
Nov 6, 2025
Dec 19, 2026
Experienced professionals who can provide both consulting and project management services for the successful design, procurement, and installation of a new roofing system. The scope of the project includes the removal of the existing roofing system, detailed assessment, design of a new roof system, and overall project management to final completion. The building is a mixed-use industrial/commercial property, and the project will involve approx. 102,000 SF of flat roof. This will include removal of the old membrane (approximately 40 years old), possible asbestos mitigation, possible concrete roof deck repair, installation of new insulation and membrane.
CityCA
Posted
Nov 6, 2026
Dec 3, 2026
Replace the existing timber steel and timber framed roof structure. removal of the existing wood and membrane roof, steel superstructure, and precast concrete columns/footings; installation of new concrete sheer walls, concrete footings, and various concrete repairs; final design and installation of a complete aluminum roof system with ladders, walk pads, vents, hatches, and flashing; installation of new membrane liner; installation of solar-powered mixing equipment and control updates; reservoir cleaning and disinfection; testing, commissioning, and site restoration. The Project also includes minor concrete repairs to the exterior of Reservoir No. 1, located at the same site.