Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Pacific NW Region PN 6615
Provide shoreline stabilization.
Posted Date
Jun 8, 2026
Due Date
Jul 8, 2026
Release: Jun 8, 2026
Pacific NW Region PN 6615
Close: Jul 8, 2026
Provide shoreline stabilization.
AvailablePacific NW Region PN 6615
Power plant turbine repair. Principal components of work to be performed under these specifications include work necessary to access and repair turbine runners and stay vanes in the Nathaniel `Nat¿ Washington Power Plant, including construction of temporary scaffolding, inspection, weld preparation, welding, grinding, and coating. See attached file.
Posted Date
May 22, 2026
Due Date
Jun 8, 2026
Release: May 22, 2026
Pacific NW Region PN 6615
Close: Jun 8, 2026
Power plant turbine repair. Principal components of work to be performed under these specifications include work necessary to access and repair turbine runners and stay vanes in the Nathaniel `Nat¿ Washington Power Plant, including construction of temporary scaffolding, inspection, weld preparation, welding, grinding, and coating. See attached file.
Pacific NW Region PN 6615
Shoreline stabilization. Protect the existing bank slopes from further erosion. Stabilizing the shoreline through the placement of void-filled riprap, including installation of large stones with voids filled using soil to reinforce shoreline structure. Supplementing riprap placement with topsoil backfill and revegetation using native grasses and shrubs below elevation 1572.00 feet. See attached file.
Posted Date
May 20, 2026
Due Date
Jun 5, 2026
Release: May 20, 2026
Pacific NW Region PN 6615
Close: Jun 5, 2026
Shoreline stabilization. Protect the existing bank slopes from further erosion. Stabilizing the shoreline through the placement of void-filled riprap, including installation of large stones with voids filled using soil to reinforce shoreline structure. Supplementing riprap placement with topsoil backfill and revegetation using native grasses and shrubs below elevation 1572.00 feet. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
Pacific NW Region PN 6615
ELECTRIC UTILITY SERVICE - BENTON COUNTY PUBLIC UTILITY DISTRICT
Effective Date
Jun 22, 2018
Expires
Effective: Jun 22, 2018
Pacific NW Region PN 6615
Expires:
ELECTRIC UTILITY SERVICE - BENTON COUNTY PUBLIC UTILITY DISTRICT
AvailablePacific NW Region PN 6615
ANDERSON RANCH DAM TURBINE MODERNIZATION AND RUNNER REPLACEMENT.
Effective Date
Jun 12, 2023
Expires
Effective: Jun 12, 2023
Pacific NW Region PN 6615
Expires:
ANDERSON RANCH DAM TURBINE MODERNIZATION AND RUNNER REPLACEMENT.
AvailablePacific NW Region PN 6615
ROZA SWITCHYARD MODERNIZATION PROJECT
Effective Date
Oct 21, 2021
Expires
Effective: Oct 21, 2021
Pacific NW Region PN 6615
Expires:
ROZA SWITCHYARD MODERNIZATION PROJECT
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge