Wiring Primary Shacks 1-4 & Bldg. 240
Posted
Aug 14, 2026
Sep 10, 2026
Work generally consists of the replacement and relocation of power wiring for primary collector shacks 1-4, sealing conduit routing embedded in concrete, removal of an electrical panel, as well as the replacement of junction boxes, conduit, and wiring in the basement of bldg. 240.
