Special DistrictIL
Posted
Sep 14, 2026
Oct 29, 2026
Wiring Primary Shacks 1-4 & Bldg. 240 RFP
The work generally consists of the replacement and relocation of power wiring for primary collector shacks 1-4, sealing conduit routing embedded in concrete, removal of an electrical panel, as well as the replacement of junction boxes, conduit, and wiring.
