CityWY
Posted
Sep 18, 2026
Oct 6, 2026
WRF CCTV Pipeline Inspection System RFP
1 LS CCTV Sewer Inspection Vehicle; 1 LS Miniature Steerable Camera Crawler; 1 LS Push Camera; 1 LS 360° Manhole Inspection System.
Description: The work generally consists of approx. of removing existing 30" and 18" odorous air piping above grade and in the tunnels of the Thickener Control Building, abandoning 30” odorous air piping below grade with flowable fill, and installing new above grade 24" and 30" stainless steel air mains and air main supports from (4) thickener tanks to the inlet of the existing odorous air fan. The work generally consists of abandoning existing underground 30" air main piping between the main building (Building 20) and Operating Gallery B (Building 150) with flowable fill, and replacing this air main with 30" stainless steel air piping mounted above grade with air main supports. Concrete and landscaping shall be restored at both sites as needed. Contract to include all start up, testing, and balancing of the new air piping.
SpecialDistrict · IL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityWY
Posted
Sep 18, 2026
Oct 6, 2026
1 LS CCTV Sewer Inspection Vehicle; 1 LS Miniature Steerable Camera Crawler; 1 LS Push Camera; 1 LS 360° Manhole Inspection System.
Special DistrictIL
Posted
Sep 16, 2026
Oct 15, 2026
The work generally consists of demolition of the existing East Scrubber Odor Control System in and around Building, installation of a new East Scrubber Odor Control System, in and around Building 390, and adding a new odor control scrubber system at Pump Station 5 (located in the Lake County Greenbelt Forest Preserve).
Special DistrictFL
Posted
-
Oct 6, 2026
JEA is soliciting qualifications for professional engineering and permitting services for upgrades to the Buckman Water Reclamation Facility. The work may include rehabilitation of the influent pump station and primary clarifiers, improvements to the Talleyrand Avenue Lift Station and grit removal system, expansion of the vacuum truck unloading facility, potable water and gravity sewer improvements, and related surveying, geotechnical, modeling, design, permitting, and construction services. Respondents must attend the mandatory pre-response meeting and site visit, and responses are due October 6, 2026, at 12:00 PM EST.
CityMT
Posted
-
Nov 4, 2026
The project consists of demolition of existing digester gas piping, valves, gas safety equipment, hvac ducts and air handler units. Installation of new digester gas piping, valves, digester gas equipment, control, and safety devices. Installing (2) two new digester gas foam separators, associated water supply piping, drain piping, power and controls. Installation of new 3-ton monorail track, (2) two manual track switches, electric hoist and trolley, manual hoist and trolley, structural steel supports, and exterior monorail support structure and installation of digester gas cover pressure and vacuum safety devices for the two primary digesters and secondary digester gasholder covers.
Decision makers connected to this RFP from North Shore Sanitary District.