Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
North Dakota Mill and Elevator Association
Project includes station preparation activities for the removal and demolition of existing wheat conveyors, cleaning equipment, E-Mill flour milling equipment, midds pellet cooling equipment, and all associated conveyance, fans, filters, ductwork, spouting and related appurtenances along with demo of CMU walls, doors, and concrete pads/curbs/flooring. New general construction activities include the Contractor supply and installation of structural steel, concrete, rebar, grout, and related construction materials along with core drilling of concrete holes, grouting of equipment and holes around equipment/piping/spouts/duct, curbs, wall/floor/roof flashing, and sealing. New mechanical construction activities consist of millwright work for the installation of Owner furnished filters, purifiers, blowers, fans, motors, r oller mills, hammer mill, wheat heater, scales, loss-in-weight measurer, magnet spouts, separators, aspirators, bin dischargers, scourers, sifters, bran finishers, vibro-feeders, drag conveyors, screw conveyors, bucket elevators, color sorter, dampening machine, infestation destroyer, rotary valves, airlocks, cyclones, pneumatic conveying systems, bran finishers, diverters, slide gates, related appurtenances, instruments, and milling equipment related piping, spouting, and ductwork.
Posted Date
Jul 22, 2026
Due Date
Aug 12, 2026
Release: Jul 22, 2026
North Dakota Mill and Elevator Association
Close: Aug 12, 2026
Project includes station preparation activities for the removal and demolition of existing wheat conveyors, cleaning equipment, E-Mill flour milling equipment, midds pellet cooling equipment, and all associated conveyance, fans, filters, ductwork, spouting and related appurtenances along with demo of CMU walls, doors, and concrete pads/curbs/flooring. New general construction activities include the Contractor supply and installation of structural steel, concrete, rebar, grout, and related construction materials along with core drilling of concrete holes, grouting of equipment and holes around equipment/piping/spouts/duct, curbs, wall/floor/roof flashing, and sealing. New mechanical construction activities consist of millwright work for the installation of Owner furnished filters, purifiers, blowers, fans, motors, r oller mills, hammer mill, wheat heater, scales, loss-in-weight measurer, magnet spouts, separators, aspirators, bin dischargers, scourers, sifters, bran finishers, vibro-feeders, drag conveyors, screw conveyors, bucket elevators, color sorter, dampening machine, infestation destroyer, rotary valves, airlocks, cyclones, pneumatic conveying systems, bran finishers, diverters, slide gates, related appurtenances, instruments, and milling equipment related piping, spouting, and ductwork.
AvailableNorth Dakota Mill and Elevator Association
Scope of work to generally consist of the following Upgrade the existing HVAC system for the office building, including removal of the existing heat pumps and installation of new fan coil units, a chiller, and user-friendly control systems for the Owner. Removal and replacement of existing interior finishes. Electrical work to provide power for equipment updates
Posted Date
May 13, 2026
Due Date
Jun 18, 2026
Release: May 13, 2026
North Dakota Mill and Elevator Association
Close: Jun 18, 2026
Scope of work to generally consist of the following Upgrade the existing HVAC system for the office building, including removal of the existing heat pumps and installation of new fan coil units, a chiller, and user-friendly control systems for the Owner. Removal and replacement of existing interior finishes. Electrical work to provide power for equipment updates
North Dakota Mill and Elevator Association
Project requires the replacement of two 190' tall whole wheat bucket elevators in the terminal building. Each bucket elevator will be replaced with a similar sized elevator with extended height, increased rate to 20,000 bph, and equipped with nfpa compliant appurtenances. The elevators will extend through the current roof which will require new concrete roof penetrations. New structural steel will be installed on the roof to serve as support for the new elevator head sections and provide maintenance access. A new elevator feed drag conveyor will be added at the boot of one elevator. A new 175 bph station cleaning bucket elevator and drag conveyor will be added to the station.
Posted Date
Mar 11, 2026
Due Date
Apr 7, 2026
Release: Mar 11, 2026
North Dakota Mill and Elevator Association
Close: Apr 7, 2026
Project requires the replacement of two 190' tall whole wheat bucket elevators in the terminal building. Each bucket elevator will be replaced with a similar sized elevator with extended height, increased rate to 20,000 bph, and equipped with nfpa compliant appurtenances. The elevators will extend through the current roof which will require new concrete roof penetrations. New structural steel will be installed on the roof to serve as support for the new elevator head sections and provide maintenance access. A new elevator feed drag conveyor will be added at the boot of one elevator. A new 175 bph station cleaning bucket elevator and drag conveyor will be added to the station.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge