Jersey Avenue Water Main Replacement Project, Phase III RFP
-
Closes
Aug 26, 2026
Installation of 1,237 LF of 20" diameter ductile iron water; 250 LF of 24" diameter HDPE water main installed by Horizontal Direction Drill (HDD); replacement of curb boxes and water services; soil erosion and sediment control; test pits; excavation; backfilling; dewatering; chlorination; pipe pressure and leakage tests; water service connections; pipe abandonment; pipe removal and disposal; valves and fittings; site work including pavement trench restoration; final mill and surface paving; concrete curb replacement (if and where directed) and general site restoration.