Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
New Bedford Housing Authority
The Project consists of but not limited to upgrades of existing front and rear porch lights throughout the development. Install one photocell per building to control all porch lights. The work also includes addition of new exterior lighting wall pacs, and visitor parking lot lighting to improve exterior illumination. Refer to attachment.
Posted Date
Jul 8, 2026
Due Date
Jul 30, 2026
Release: Jul 8, 2026
New Bedford Housing Authority
Close: Jul 30, 2026
The Project consists of but not limited to upgrades of existing front and rear porch lights throughout the development. Install one photocell per building to control all porch lights. The work also includes addition of new exterior lighting wall pacs, and visitor parking lot lighting to improve exterior illumination. Refer to attachment.
AvailableNew Bedford Housing Authority
The Project consists of but not limited to furnish/install all labor, materials and equipment necessary for the replacement of existing cast iron sanitary drainage piping located in the crawl space with new PVC drainage piping, and associated work as specified within the contract documents. Refer to attachment.
Posted Date
Jul 8, 2026
Due Date
Jul 30, 2026
Release: Jul 8, 2026
New Bedford Housing Authority
Close: Jul 30, 2026
The Project consists of but not limited to furnish/install all labor, materials and equipment necessary for the replacement of existing cast iron sanitary drainage piping located in the crawl space with new PVC drainage piping, and associated work as specified within the contract documents. Refer to attachment.
AvailableNew Bedford Housing Authority
Exterior lighting upgrades to the existing residential units, including the following: replacing the front and rear porch sconces at each unit with new LED sconces having integral photocell control, and covering all interior porch light switches so the porch lighting is controlled solely by the integral photocells.
Posted Date
Jul 8, 2026
Due Date
Jul 23, 2026
Release: Jul 8, 2026
New Bedford Housing Authority
Close: Jul 23, 2026
Exterior lighting upgrades to the existing residential units, including the following: replacing the front and rear porch sconces at each unit with new LED sconces having integral photocell control, and covering all interior porch light switches so the porch lighting is controlled solely by the integral photocells.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Director of Modernization, Planning & Development
Premium
Access the largest public sector contact database
© 2026 Starbridge