Mount Holly, NC - Construction of the South Gateway Connector Road Phase 2
Jul 24, 2026
Closes
Aug 24, 2026
The City of Mount Holly is soliciting bids for the construction of approximately 550 linear feet of new public roadway connecting to Caldwell Drive, which includes a 244 LF three-span bridge. The roadway will feature two 13-foot travel lanes and a 10-foot multi-use path, along with storm drainage improvements, ADA curb ramps, and guardrail where necessary. The project also includes approximately 556 LF of 12-inch ductile iron pipe water line, partially steel encased and installed with bridge hangers; this is an active construction bid rather than a grant program.
