Milling and Resurfacing Spring Valley Road (C.R. 601) RFP
-
Closes
Aug 25, 2026
Milling and resurfacing across a 2.959-mile length of road (15,626 feet). Work includes 33,481 SY of hot mix asphalt (HMA) milling, tack coat, polymerized joint adhesive, installation of HMA surface and base courses, unclassified excavation, dense-graded aggregate base course, concrete vertical/granite block curbs, concrete sidewalks, guide rails, traffic stripes, and resetting/reconstructing existing inlets and drainage structures.