OS-5 & OS-58 Bridge Replacements
-
Closes
Sep 15, 2026
Work includes 1 LS clearing and grubbing; 485 CY common excavation; 272 CY rock excavation; 4 EA guard fence end terminal (srt); 174 LF pre-drilled pile holes; 198 LF steel pile (hp 12x53); 217 CY concrete grade 4.0 (ae) (sw); 63 SY bridge backwall protection system; 57 SY abutment strip drain; 120 tn slope protection; 1,818 SY aggregate base (ab3-(6"); 97 TN surfacing material (ss-5); 1 LS temporary pollution & erosion control; 1 LS permanent seeding.
