Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Mitchell County
Mitchell County Board of Commissioners is soliciting bids for the 2026 SAP Road Striping Project to provide road striping services on nine named roads in Mitchell County, GA. The scope includes restriping with high-build or thermoplastic paint (white fog lines and yellow centerlines), installation of raised pavement markers, thermoplastic rumble strips, stop bars, and required traffic control. Bidders must be Georgia Department of Transportation certified, provide a 10% bid bond and required insurance/affidavits, and the work must begin within 90 days of Notice to Proceed and be completed within 60 days (liquidated damages $100/day for delays).
Posted Date
-
Due Date
Aug 6, 2026
Mitchell County
Close: Aug 6, 2026
Mitchell County Board of Commissioners is soliciting bids for the 2026 SAP Road Striping Project to provide road striping services on nine named roads in Mitchell County, GA. The scope includes restriping with high-build or thermoplastic paint (white fog lines and yellow centerlines), installation of raised pavement markers, thermoplastic rumble strips, stop bars, and required traffic control. Bidders must be Georgia Department of Transportation certified, provide a 10% bid bond and required insurance/affidavits, and the work must begin within 90 days of Notice to Proceed and be completed within 60 days (liquidated damages $100/day for delays).
AvailableMitchell County
Mitchell County Board of Commissioners is soliciting bids for the 2026 SAP Road Striping Project to provide road striping services on nine named roads in Mitchell County, GA. The scope includes restriping with high-build or thermoplastic paint (white fog lines and yellow centerlines), installation of raised pavement markers, thermoplastic rumble strips, stop bars, and required traffic control. Bidders must be Georgia Department of Transportation certified, provide a 10% bid bond and required insurance/affidavits, and the work must begin within 90 days of Notice to Proceed and be completed within 60 days (liquidated damages $100/day for delays).
Posted Date
-
Due Date
Aug 6, 2026
Mitchell County
Close: Aug 6, 2026
Mitchell County Board of Commissioners is soliciting bids for the 2026 SAP Road Striping Project to provide road striping services on nine named roads in Mitchell County, GA. The scope includes restriping with high-build or thermoplastic paint (white fog lines and yellow centerlines), installation of raised pavement markers, thermoplastic rumble strips, stop bars, and required traffic control. Bidders must be Georgia Department of Transportation certified, provide a 10% bid bond and required insurance/affidavits, and the work must begin within 90 days of Notice to Proceed and be completed within 60 days (liquidated damages $100/day for delays).
AvailableMitchell County
Repair and resurface approximately 10.7 miles on 7 roads. The scope generally consists of 2,170 TNs of Road Patching by milling existing road and replacing with 3-6" of 19 MM Superpave Asphalt, 5,670 TNs of leveling, 38,870 SY of Double Chip and Sand Seal Surface Treatment, and 6,263 TNs of Asphalt Resurfacing. Project also includes traffic control, shoulder clipping, tack coat, primer, striping, shoulder restoration.
Posted Date
May 13, 2026
Due Date
Jun 16, 2026
Release: May 13, 2026
Mitchell County
Close: Jun 16, 2026
Repair and resurface approximately 10.7 miles on 7 roads. The scope generally consists of 2,170 TNs of Road Patching by milling existing road and replacing with 3-6" of 19 MM Superpave Asphalt, 5,670 TNs of leveling, 38,870 SY of Double Chip and Sand Seal Surface Treatment, and 6,263 TNs of Asphalt Resurfacing. Project also includes traffic control, shoulder clipping, tack coat, primer, striping, shoulder restoration.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $500, use sole source; otherwise not viable here, pivot to cooperative purchasing.
Coops: Ask about using Georgia DOAS Statewide Contracts or coops (Sourcewell, TIPS, PEPPM) to avoid formal bidding. Buyer hasn’t historically used coops/resellers, but you can encourage them to explore these procurement programs as future options.
Mitchell County, GA: No evidence of sole source contracting. Given the county’s extremely low $500 competitive bidding threshold, sole source is not a viable path.
Board meetings and strategic plans from Mitchell County
The board meeting covered several topics, including an update from the Sheriff regarding fleet upgrades and new personnel, a discussion on potential bathroom facility improvements at the county service building, and an update from the County Engineer on truck chassis procurement and bridge design projects. The board also discussed the pursuit of a grant for infrastructure projects and the requirements for a 28e agreement between counties and the Department of Transportation. Additionally, the board considered a request to move into a closed session regarding a pay increase for the planning and zoning department.
The board discussed a request for financial assistance from Shop on State for their new construction project. The discussion covered project progress, including the pouring of cement and secured financing, and emphasized the necessity of structuring any potential financial support as a contract for services rather than a donation. The board also reviewed the organization's fundraising efforts, the local nature of the contractors involved, and the community impact of the organization.
The board discussed multiple operational and infrastructure items. Topics included the attorney retainer fee structure, approval of the Sheriff's monthly report, and ongoing maintenance challenges related to building roof leaks and condensation issues. Park and recreation updates were provided, noting progress on campground renovations, water trail projects, and equipment orders. The County Engineer provided updates on paving projects and announced that two local bridge projects were shortlisted for grant funding. Additionally, the board addressed the process for updating speed limits and no-passing zones to comply with new regulations.
The Board of Supervisors discussed various administrative and county matters. Key topics included the denial of a claim for search software renewal due to an upcoming new website launch, a sheriff's department update on staffing and inmate costs, and a legislative requirement to adopt an annual designation for posting agendas. The county engineer provided updates on cold-in-place recycling projects, grant applications for bridge repairs, rock procurement, and the complex process of adjusting traffic signage following the increase in statutory speed limits. Finally, the treasurer highlighted a significant revenue shortfall caused by the state's failure to fully fund the family farm credit, which impacts county, city, and school district budgets.
The board discussed and approved an infill lot application and a construction loan program application for a residential project. A proposal for a website refresh was approved, ensuring future ADA compliance and providing improved functionality for various departments. The board also appointed a GASB 75 consultant. Additionally, members reported on various community and departmental meetings, including an economic development session, health and safety initiatives, and updates on planning and zoning commission activities.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Mitchell County's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge