Kanan Dume Road Biofilter
Jul 30, 2026
Closes
Aug 20, 2026
Work consists of furnishing and installing a modular stormwater filtration system, including all excavation, trenching, bedding, structural connections, and utility tie-ins necessary to integrate the unit into the existing storm drain network. Work also includes traffic control, erosion and sediment control measures, and proper disposal of construction debris.
