Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Limestone County Water And Sewer Authority
In general, the project includes a raw water pump, pre-treatment basin, main building, package filters, chemical storage & feed, splitter box, high service pump station, equalization basin, drying bed building, ductile Iron piping, electrical, SCADA, and asphalt paving.
Posted Date
Jun 5, 2026
Due Date
Jul 14, 2026
Release: Jun 5, 2026
Limestone County Water And Sewer Authority
Close: Jul 14, 2026
In general, the project includes a raw water pump, pre-treatment basin, main building, package filters, chemical storage & feed, splitter box, high service pump station, equalization basin, drying bed building, ductile Iron piping, electrical, SCADA, and asphalt paving.
AvailableLimestone County Water And Sewer Authority
Project includes replacing an ultrafiltration membrane system, a new carbon adsorption system, feed pumps, ductile iron piping, electrical, SCADA, and asphalt paving.
Posted Date
Jul 25, 2025
Due Date
Aug 26, 2025
Release: Jul 25, 2025
Limestone County Water And Sewer Authority
Close: Aug 26, 2025
Project includes replacing an ultrafiltration membrane system, a new carbon adsorption system, feed pumps, ductile iron piping, electrical, SCADA, and asphalt paving.
Limestone County Water And Sewer Authority
The project consist 24" DIP CL. 250, push-on joint, furnished and installed. 24" DIP, CL. 250, restrained joint, furnished and installed. 12" DIP CL. 350, restrained joint, furnished and installed. 8" DIP CL. 350, restrained joint, furnished and installed. 6" DIP CL. 350, restrained joint, furnished and installed. Bored road crossing, Sta. 70+73 to Sta. 71+73, 24" RJ DIP w/ encasement, furnished and installed. Bored road crossing Sta. 125+81 to Sta. 126+31, 24" RJ DIP w/ encasement, furnished and installed. Open cut road crossing, Sta. 17+60 to Sta. 18+00, 24" RJ DIP w/ encasement, furnished and installed. Open cut creek crossing, Sta. 14+26 to Sta. 14+66, 24" RJ DIP w/concrete encasement, furnished and installed. See outside link or attached file.
Posted Date
Mar 18, 2025
Due Date
Apr 22, 2025
Release: Mar 18, 2025
Limestone County Water And Sewer Authority
Close: Apr 22, 2025
The project consist 24" DIP CL. 250, push-on joint, furnished and installed. 24" DIP, CL. 250, restrained joint, furnished and installed. 12" DIP CL. 350, restrained joint, furnished and installed. 8" DIP CL. 350, restrained joint, furnished and installed. 6" DIP CL. 350, restrained joint, furnished and installed. Bored road crossing, Sta. 70+73 to Sta. 71+73, 24" RJ DIP w/ encasement, furnished and installed. Bored road crossing Sta. 125+81 to Sta. 126+31, 24" RJ DIP w/ encasement, furnished and installed. Open cut road crossing, Sta. 17+60 to Sta. 18+00, 24" RJ DIP w/ encasement, furnished and installed. Open cut creek crossing, Sta. 14+26 to Sta. 14+66, 24" RJ DIP w/concrete encasement, furnished and installed. See outside link or attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Limestone County Water And Sewer Authority
The Limestone County Water & Sewer Authority's mission is to be a reliable and efficient provider of clean and potable water and wastewater treatment services to its customers. The organization's goals include providing quality and affordable services, ensuring responsive and continuous customer support, supporting Limestone County's residential and commercial growth through diligent long-term planning, maintaining and upgrading the current system for reliability, proactively adapting to changing regulatory, environmental, and social conditions, and being a responsible community member and steward of entrusted resources.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Limestone County Water And Sewer Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge