Lake Bluff Golf Club Water Main Installation and Fire Suppression System Project
Posted
Aug 26, 2026
Sep 24, 2026
The project includes installation of a new 6" water main to the building for fire suppression. The project includes a new fire suppression system as well as all interior plumbing required for the installation of the fire suppression system. The project also includes the installation of an alarm system to be installed within the pole barn that is north of the golf club building.
