RFB-100-27 CHFS - OAK - Repair or Replace Building 501 Chiller
Posted
Oct 14, 2026
Nov 10, 2026
The project replaces nine failing modular air-cooled chillers in an areaway at Building 501 with two new chillers. Existing electrical gear will be reused with new fuses and conductors, and ductwork will be modified to route condenser air to grade level. New piping and heat trace will be installed from the mechanical-room wall to the new chillers.

