Joliet West High School Phase 4 Student Center Addition & Renovations RFP
Posted
Oct 8, 2026
Nov 12, 2026
Project consists of student center addition of approx 43,000 sf. Renovations of approx 5,000 sf. Existing roof replacement of approx. 31,000 sf. Project will be bid in two phases. Phase 1 will include demolition work, building concrete work, structural steel work, timber framing work, elevator work, electrical & low voltage, site utilities & storm water detention, site work & excavation. Phase 2 work to include masonry work, miscellaneous steel work, carpentry work, casework & millwork work, roofing work, glass &, glazing work, drywall & framing & acoustical work, rain screen terracotta, resilient flooring work painting work, tile flooring & wall tile work, terrazzo work, fire protection work, plumbing work, hvac work, electrical work, paving & curbs, landscaping. Bid packages: 02 ademolition work, 03 abuilding concrete work, 05a structural steel work, 06 a timber framing work, 14a elevator work, 26a electrical & low voltage, 31a site work site utilities & storm water detention.

