Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Johnson County Water District 1
Installation of numerous potable water mains projects using the horizontal directional drilling (HDD) and traditional open-cut trenching methods within the boundaries of water district no. 1, and all appurtenant work as specified for a contract term of 1 year with the potential for extending the contract for a second, third, fourth, and fifth year with annual unit price adjustments based on the engineering news record construction cost index (ENR CCI).
Posted Date
Jun 12, 2026
Due Date
Jul 14, 2026
Release: Jun 12, 2026
Johnson County Water District 1
Close: Jul 14, 2026
Installation of numerous potable water mains projects using the horizontal directional drilling (HDD) and traditional open-cut trenching methods within the boundaries of water district no. 1, and all appurtenant work as specified for a contract term of 1 year with the potential for extending the contract for a second, third, fourth, and fifth year with annual unit price adjustments based on the engineering news record construction cost index (ENR CCI).
AvailableJohnson County Water District 1
Installation of potable water mains using open-cut trenching, Horizontal Directional Drilling (HDD), and Bore methods.
Posted Date
Oct 31, 2025
Due Date
Dec 4, 2025
Release: Oct 31, 2025
Johnson County Water District 1
Close: Dec 4, 2025
Installation of potable water mains using open-cut trenching, Horizontal Directional Drilling (HDD), and Bore methods.
Johnson County Water District 1
Demolition and disposal of the existing three (3) blowers, piping and accessories in the facility 2 north filter gallery. Installation of two (2) owner supplied blowers including transportation of blowers from storage location to installation location. Provide and install all ancillary equipment and associated piping, ducting, insulation, housekeeping pads, and other components necessary for a fully operational system. Modify existing system arrangement as necessary to support new equipment locations, piping routing, and system connections. Apply painting, coatings, and/or insulation to blower piping and ducting. Replace existing power and control cabling between the blower skids, the motor control center, and control panels. Start-up and commissioning of all new equipment and associated systems installed under this contract.
Posted Date
May 22, 2026
Due Date
Jun 18, 2026
Release: May 22, 2026
Johnson County Water District 1
Close: Jun 18, 2026
Demolition and disposal of the existing three (3) blowers, piping and accessories in the facility 2 north filter gallery. Installation of two (2) owner supplied blowers including transportation of blowers from storage location to installation location. Provide and install all ancillary equipment and associated piping, ducting, insulation, housekeeping pads, and other components necessary for a fully operational system. Modify existing system arrangement as necessary to support new equipment locations, piping routing, and system connections. Apply painting, coatings, and/or insulation to blower piping and ducting. Replace existing power and control cabling between the blower skids, the motor control center, and control panels. Start-up and commissioning of all new equipment and associated systems installed under this contract.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Johnson County Water District 1
The Board adopted the 2026 Budget and amended Rule XVIII to reflect a 2.9% overall water rate increase effective January 1, 2026. Revisions to the WaterOne Personnel Policy Manual and Employee Business Expense Policy were approved. The 7th Revised Retirement Plan was revised to allow lump sums as an alternate form of payment for employees hired after January 1, 2005. Change orders were approved for the Hansen Basin Painting -- Phase II project and the Kansas and Missouri Presed Pavement Replacement project. A resolution was adopted recognizing Bob Reese for his years of service.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Johnson County Water District 1's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge