Board Post Meeting Wrap Up
The Board authorized the designation of $3,000,000 in System Development Funds for master plan projects. Additionally, the Board approved a change order for the Hansen Basin Painting project, awarded a contract for the Facility II Air Wash Blower Replacement, and released master plan funds for the installation of both a 20-inch transmission main and an 8-inch water main.