Beacon Street Resurfacing Project (Request for Proposal)
Aug 6, 2026
Closes
Aug 19, 2026
Work includes approx 2,667 square yards of HMA will be cold milled and 553 tons of new HMA material will be used to resurface the street in two courses. Approximately 340 square feet of damaged sidewalk and 640 square feet of ADA ramps are to be replaced during the resurfacing. Also included is the resurfacing approx 405 square yards of asphalt material will be cold milled and replace with approximately 90 tons of new HMA material placed in two courses.
