Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Idaho Department of Administration
The main scope is lighting replacement, and the existing ceiling grid will be removed in rooms 211, 210 ,213, 215 and replaced new owner provided 2x2 led lights. The ceilings will be open to structure. Exterior entry finish: The Exterior entry 201 will have a new floor finish installed. Alternate 1 – cable Tray, pathway for data and low voltage. Alternate 2 – bathroom remodel (additional 140 days, winter break construction, 170 project days.
Posted Date
Jun 11, 2026
Due Date
Jun 30, 2026
Release: Jun 11, 2026
Idaho Department of Administration
Close: Jun 30, 2026
The main scope is lighting replacement, and the existing ceiling grid will be removed in rooms 211, 210 ,213, 215 and replaced new owner provided 2x2 led lights. The ceilings will be open to structure. Exterior entry finish: The Exterior entry 201 will have a new floor finish installed. Alternate 1 – cable Tray, pathway for data and low voltage. Alternate 2 – bathroom remodel (additional 140 days, winter break construction, 170 project days.
AvailableIdaho Department of Administration
Repair of miscellaneous conditions at the exterior wall with outside repairs. Repair of miscellaneous conditions at the exterior wall of the building including but not limited to: brick masonry repair/replacement, repair/replacement of mortar and sealants, minor paint, trim and flashing work
Posted Date
-
Due Date
Jun 23, 2026
Idaho Department of Administration
Close: Jun 23, 2026
Repair of miscellaneous conditions at the exterior wall with outside repairs. Repair of miscellaneous conditions at the exterior wall of the building including but not limited to: brick masonry repair/replacement, repair/replacement of mortar and sealants, minor paint, trim and flashing work
AvailableIdaho Department of Administration
Include installing a new irrigation system on site that utilizes the existing well and control panel. All other aspects of the irrigation system will be new. The existing irrigation control system won’t require any additional upgrades. The front of the building will receive new landscape shrub and tree plantings as well as the building courtyard.
Posted Date
Jun 8, 2026
Due Date
Jun 24, 2026
Release: Jun 8, 2026
Idaho Department of Administration
Close: Jun 24, 2026
Include installing a new irrigation system on site that utilizes the existing well and control panel. All other aspects of the irrigation system will be new. The existing irrigation control system won’t require any additional upgrades. The front of the building will receive new landscape shrub and tree plantings as well as the building courtyard.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Idaho Department of Administration
The committee reviewed updates on open enrollment and the new plan year, including improvements in program accessibility with Albertson/Safeway, expanded vision insurance coverage for minor plan members, and the removal of the dental and orthodontia waiting period. Operational updates included the implementation of a new online ticketing system for tracking customer service metrics and the adoption of a secure online enrollment tool for non-SCO agencies. Additionally, the committee reviewed the Regence Quarterly Business Review, financial reports concerning reserve balances, and claims data for dental services.
The committee held a meeting covering several key financial and operational topics. A cash analysis report was reviewed detailing fiscal year projections, actuals, and retained risk premiums. A three-year loss history update was provided to identify trends across fiscal years 2023 to 2025. Additionally, the committee discussed property damage claims, complex liability issues involving employment allegations, and building appraisal information. The loss control manager presented a report regarding engineering visits to state-insured properties and associated loss expectancy.
The meeting agenda includes the approval of the December 2, 2025, PBFAC Meeting Minutes. Key discussion items focus on various project reviews and selections across different categories. Delegated Projects include items for Boise State University (BSU) Student Union and Center for Teaching and Learning renovations. Delegated Project Reviews cover improvements at the University of Idaho (UI) Blake House, BSU Capital Village #3, and BSU Environmental Research Building. Small Projects include door replacement at CSI Expo Center and chiller repairs at UI Idaho Water Center. The agenda also covers Design Professional Selections for projects at Idaho State University (ISU), BSU, and UI; Design-Build Reviews for Idaho State Historical Society (ISHS) and Idaho Department of Correction (IDOC); Mid-Range Reviews for Department of Health and Welfare (DHW); Preliminary and Final Reviews for UI McCall Field Campus; Project Updates for ISU; and Old Business related to the ISU Beckley Nursing Remodel.
The Risk Management Advisory Committee meeting included a financial review with cash analysis and budget updates, a loss history update, and a building appraisal update. The committee discussed and approved a Recreational Vehicle Policy to add recreational vehicle coverage and watercraft coverage to the current Auto Physical Damage coverage. The Loss Control Manager provided a 2024 update, highlighting engineering visits at State insured properties and associated recommendations.
The meeting included financial updates on medical and dental claims, with discussions on claim expenses, reserve balances, and fiscal year projections. An overview of the Office of Group Insurance was presented, covering staffing, budget, and the growth of the plan since 2020. The Regence plan transition was reviewed, highlighting member disruption issues and the responsiveness of the Regence Account Management team. Future plans include focusing on operational processes, monitoring carriers, improving LUMA functionality, replacing paper enrollment, enhancing the website, and monitoring healthcare landscape changes.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Idaho Department of Administration's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge