Maintenance Door /Window Replacement RFP
Aug 6, 2026
Closes
Aug 17, 2026
Work includes removal of existing maintenance door slabs and threshold; frame and close in maintenance door opening with 36" x 80" steel commercial door; replace 19 single hung windows on 1950 original building.