Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Guntersville Water Board's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Guntersville Water Board
Work includes twelve 8" -10" PVC sanitary sewer main repairs and 24 service lateral connection renewals; 394 LF of 8" -10" sewer main by open cut replacement and three service lateral open cut replacements; 2,293 LF of 8" -10" main rehabilitation with cured-in-place (CIPP) lining, 16 CIPP liner end seals, 29 service reinstatements, and twelve 4" -6" service lateral rehabilitations with CIPP lining; eight service lateral CIPP lining without main lining; 989 LF of 8" -10" sanitary sewer mainline replacement by pipe bursting method and 13 service lateral reconnections; miscellaneous manhole improvements including three manholes needing joint and connection sealings, one invert/bench replacement, and one invert and drop cleaning; 906 LF for heavy main line cleaning and CTV inspection; raising 44 manhole frame and covers; and one manhole replacement.
Posted Date
Mar 25, 2025
Due Date
May 1, 2025
Release: Mar 25, 2025
Guntersville Water Board
Close: May 1, 2025
Work includes twelve 8" -10" PVC sanitary sewer main repairs and 24 service lateral connection renewals; 394 LF of 8" -10" sewer main by open cut replacement and three service lateral open cut replacements; 2,293 LF of 8" -10" main rehabilitation with cured-in-place (CIPP) lining, 16 CIPP liner end seals, 29 service reinstatements, and twelve 4" -6" service lateral rehabilitations with CIPP lining; eight service lateral CIPP lining without main lining; 989 LF of 8" -10" sanitary sewer mainline replacement by pipe bursting method and 13 service lateral reconnections; miscellaneous manhole improvements including three manholes needing joint and connection sealings, one invert/bench replacement, and one invert and drop cleaning; 906 LF for heavy main line cleaning and CTV inspection; raising 44 manhole frame and covers; and one manhole replacement.
Guntersville Water Board
Invites qualified bidders to submit proposals for removing an existing chain link fence erecting a new 53’-4” x 55’-4” x 8’-0” high masonry screen wall around the existing pump station. See attached bid ad.
Posted Date
Dec 18, 2024
Due Date
Jan 27, 2025
Release: Dec 18, 2024
Guntersville Water Board
Close: Jan 27, 2025
Invites qualified bidders to submit proposals for removing an existing chain link fence erecting a new 53’-4” x 55’-4” x 8’-0” high masonry screen wall around the existing pump station. See attached bid ad.
Guntersville Water Board
Work includes removing a fence enclosure around the existing sewage pump station and erecting a new masonry screen wall around the pump station.
Posted Date
Sep 16, 2024
Due Date
Oct 23, 2024
Release: Sep 16, 2024
Guntersville Water Board
Close: Oct 23, 2024
Work includes removing a fence enclosure around the existing sewage pump station and erecting a new masonry screen wall around the pump station.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.