Seed Farm Road Reconstruction
Jul 28, 2026
Closes
Aug 25, 2026
Replace or extend three 18" CMP culverts which cross the road at three separate locations. Scarify the existing surface to a depth of 8". Re-compact the scarified surface. Place 10" of Aggregate Base Material. Pave with 4" of Asphalt Concrete. Install Centerline and Edgeline Striping. Install Warning and Regulator Signs.