Indigenous GovernmentAZ
Posted
Aug 26, 2026
Nov 18, 2026
Design Services for District 4 Subdivision Sites 1 and 6 (Request for Proposal) *REBID*
Provide design services for district 4 subdivision sites 1 and 6.
Description: The Gila River Indian Community seeks qualified civil engineering firms to design two residential subdivisions in District 4, each approximately 19 acres. The scope includes preliminary and final plats, roadway, grading, drainage, water, sewer, and utility plans, construction documents, drainage and water/sewer concept reports, and construction administration. The selected firm must complete the services within 360 days after notice to proceed and coordinate with the Community’s Department of Public Works, including on potential lift-station designs.
IndigenousGovernment · AZ, US
Adjacent opportunities open for bidding right now.
Indigenous GovernmentAZ
Posted
Aug 26, 2026
Nov 18, 2026
Provide design services for district 4 subdivision sites 1 and 6.
CityOH
Posted
Oct 29, 2026
Nov 12, 2026
The project includes the extension of various streets and utilities for the next phase of a residential subdivision located on village owned property. Work includes 90 LF of sawcut existing roadway; 1,766 CY of excavation; 1,178 CY of 10" aggregate base; 135 CY of 1-1/4" AC surface course; 290 2-3/4" AC intermediate course; 1,561 LF of combination curb and gutter; 2,226 SF of 4" concrete walk; 1 Ea concrete curb ramp w/truncated domes; 699 LF of 12" HDPE storm sewer (granular backfill); 99 LF of 15" HDPE storm sewer (granular backfill); 2 EA storm sewer manhole; 8 EA type 1 catch basin; 188 LF of 8" SDR-35 sanitary sewer (native backfill); 113 LF of 8" SDR-35 sanitary sewer (granular backfill); 284 LF of 12" SDR-35 sanitary sewer (native backfill); 50 LF of 12" SDR-35 sanitary sewer (granular backfill); 3 EA sanitary sewer manhole; 1 LS of misc connections to existing sanitary sewer; 462 LF of 6" C-900 waterline (native backfill); 106 LF of 6" C-900 waterline (granular backfill); 224 LF of 1" water service line, SDR-9 PE 3608; 7 EA 1" water service connections; 2 EA 6" water valve; 2 EA fire hydrant assembly. See attached files.
Port Of Port Arthur Navigation District
Special DistrictTX
Posted
Aug 14, 2026
Nov 11, 2026
This bid package is for Berth 1-2 ICCP Systems Project. Installation of 6 rectifiers (3 soil side and 3 water side). Installation of galvanized racks to house rectifiers and junction boxes. Installation of 3 deep well anodes (soil side) and 3 linear anodes (water side). Installation of conduit and wiring associated with the rectifiers and anodes. Installation of concrete, rebar, and associated connection hardware for deep well anodes. Installation of 12 cathodic protection test well stations.
Lancaster County School District
School DistrictSC
Posted
Oct 7, 2026
Nov 10, 2026
Purchase, delivery and installation of cafeteria equipment for multiple school locations within the district. Item 1: Rational iCombi Pro 6-full size + 6-full size G UG Combi Oven. Item 2: Victory Pass-Thru Heated Cabinet; Model # HS-1D-1-PT-HD. Item 3: Victory Pass-Thru Half- Door Refrigerator; Model # RS-1D-S1-PT-HD-HC. Item 4: Rational iCombi Pro 6-full size + 10-full size E UG Combi Oven.
Decision makers connected to this RFP from Gila River Indian Community.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File Retrieval