Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Giant City Community Consolidated School District 130
Work includes removal of the existing floor tile, mastic and wall base in the locker rooms and athletic office. Removal of the carpet in the media center and music room. Install new epoxy flooring in the locker rooms and athletic office, new carpet tile in the music and media center. Install new casework in classrooms 103, 104, 105 , 106, 107. Exterior work includes concrete sidewalks, patio and retaining wall with railings. Install new benches and picnic tables around the site. Replace existing downspouts on the building.
Posted Date
Feb 28, 2026
Due Date
Mar 18, 2026
Release: Feb 28, 2026
Giant City Community Consolidated School District 130
Close: Mar 18, 2026
Work includes removal of the existing floor tile, mastic and wall base in the locker rooms and athletic office. Removal of the carpet in the media center and music room. Install new epoxy flooring in the locker rooms and athletic office, new carpet tile in the music and media center. Install new casework in classrooms 103, 104, 105 , 106, 107. Exterior work includes concrete sidewalks, patio and retaining wall with railings. Install new benches and picnic tables around the site. Replace existing downspouts on the building.
AvailableGiant City Community Consolidated School District 130
Exterior Renovations Include: Replacement of designated low-slope roof areas; coating of existing metal roofing; modifications to existing flashings; and replace designated sections of roof drainage. Interior Renovations Include: Replacement of existing flooring, including abatement of asbestos flooring, in corridors, classrooms, office, and toilets; replacement of lockers; replacement of toilet partitions; and upgrade attic sprinkler piping.
Posted Date
Feb 5, 2025
Due Date
Mar 18, 2025
Release: Feb 5, 2025
Giant City Community Consolidated School District 130
Close: Mar 18, 2025
Exterior Renovations Include: Replacement of designated low-slope roof areas; coating of existing metal roofing; modifications to existing flashings; and replace designated sections of roof drainage. Interior Renovations Include: Replacement of existing flooring, including abatement of asbestos flooring, in corridors, classrooms, office, and toilets; replacement of lockers; replacement of toilet partitions; and upgrade attic sprinkler piping.
Giant City Community Consolidated School District 130
Replacement of designated HVAC equipment, including duct work, accessories and controls.
Posted Date
Feb 5, 2025
Due Date
Feb 18, 2025
Release: Feb 5, 2025
Giant City Community Consolidated School District 130
Close: Feb 18, 2025
Replacement of designated HVAC equipment, including duct work, accessories and controls.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Giant City Community Consolidated School District 130
The strategic plan for Giant City Community Consolidated District #130 aims to ensure the social, emotional, and academic success of every student by fostering an adaptive, innovative, and inclusive environment that cultivates collaboration, curiosity, resilience, and responsible citizenship. The plan is structured around four core values: Student Success and Educational Excellence, Financial Stability and Sustainability, Staff and Student Wellness and Support, and Community Engagement and Communication. Key objectives include providing a high-quality, holistic education, ensuring fiscal responsibility, maintaining a safe and supportive environment, and strengthening collaboration with families and the broader community.
A special meeting is scheduled to conduct a public hearing of the 2025-2026 Budget. The regular September 2025 meeting will conduct all regular monthly business scheduled to be considered by the Board of Education for the month of September.
The meeting included organization updates on GCSPA Trivia Night and Junior Prom preparations, as well as Booster's fundraising plans for the Sports Banquet. The board approved the amended 2024-2025 school calendar and the 2025-2026 school calendar. The Interior/Exterior Health/Life Safety Renovation Project bid was awarded to Evrard Companies. The board approved Meryn Gross as a K-4 special education teacher and approved the reduction in force of Rebecca Jarvis, Marcella Sevy, and Bonnie Hickey. The nonrenewal of Jesica Aldridge as a licensed teacher was also approved.
The meeting included discussions and actions on several key items. The consent agenda was confirmed, accepted, and approved. The superintendent was directed to create the 2024 Tax Levy. The board approved an increase in Baseball/Softball Umpire pay rates for the next school year. They also approved Mrs. Popov and Mrs. Dillow as after-school tutors for the 2024-2025 school year, and Mrs. Booth as the Stronger Connections Grant Facilitator. The audit report and findings for the fiscal year 2024 were adopted. The resignation of Shadrian McDaniel as assistant basketball coach was approved, and a recommendation to increase the athletic director's stipend was also approved. Additionally, the closed session minutes from September 16, 2024, were adopted.
The meeting included discussions and approvals related to a consent agenda, the October 2024 Maintenance Grant application, and a resolution for the issue and sale of health life safety bonds. The board also moved to and adjourned from a closed session. Employment approvals were granted for a new after school tutor and a paraprofessional, pending successful completion of pre-employment paperwork. Additionally, the closed session minutes from a previous meeting were adopted, and another tutor was approved.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Giant City Community Consolidated School District 130's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant Principal and McKinney-Vento District Liaison
Premium
Access the largest public sector contact database