Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
University or college mascot.
Full-time equivalent employees.
Graduation rate percentage.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Georgia Piedmont Technical College
Provide vending services for their campus locations.
Posted Date
Aug 13, 2025
Due Date
Sep 30, 2025
Release: Aug 13, 2025
Georgia Piedmont Technical College
Close: Sep 30, 2025
Provide vending services for their campus locations.
Georgia Piedmont Technical College
Construction of ADA ramp. The scope of site work includes, but is not limited to the following: 1. Construction staking and other construction engineering required to control the work. 2. Erosion and sedimentation control construction. 3. Temporary groundwater control. 4. Site preparation, including stripping and undercutting unsuitable subgrade soils, demolition, and removal from the project lands of materials not to be used for construction. 5. Site grading, including excavation, filling, compaction, and preparation of subgrades for paving. Site grading includes importing material, stockpiling and hauling from stockpiles, and other work necessary to construct embankments and excavations as shown and specified. 6. Construction of building pads and staging areas. 7. Coordination of temporary utilities. 8. Installation of the complete site drainage system complete, including building roof drain laterals. 9. Installation of the complete water distribution and sanitary sewer system complete, including service laterals. 10. Construction of curbs. 11. Construction of paving. 12. Striping and traffic control. 13. Backfilling curbs and islands with approved soils for planting. 14. Backfilling walls. 15. Installation and coordination of temporary warning signs, directional signs, barricades and fences required to direct, control and protect the public throughout the construction period. 16. Coordination of installation of light poles, irrigation systems, and associated conduits.
Posted Date
May 28, 2025
Due Date
Jun 30, 2025
Release: May 28, 2025
Georgia Piedmont Technical College
Close: Jun 30, 2025
Construction of ADA ramp. The scope of site work includes, but is not limited to the following: 1. Construction staking and other construction engineering required to control the work. 2. Erosion and sedimentation control construction. 3. Temporary groundwater control. 4. Site preparation, including stripping and undercutting unsuitable subgrade soils, demolition, and removal from the project lands of materials not to be used for construction. 5. Site grading, including excavation, filling, compaction, and preparation of subgrades for paving. Site grading includes importing material, stockpiling and hauling from stockpiles, and other work necessary to construct embankments and excavations as shown and specified. 6. Construction of building pads and staging areas. 7. Coordination of temporary utilities. 8. Installation of the complete site drainage system complete, including building roof drain laterals. 9. Installation of the complete water distribution and sanitary sewer system complete, including service laterals. 10. Construction of curbs. 11. Construction of paving. 12. Striping and traffic control. 13. Backfilling curbs and islands with approved soils for planting. 14. Backfilling walls. 15. Installation and coordination of temporary warning signs, directional signs, barricades and fences required to direct, control and protect the public throughout the construction period. 16. Coordination of installation of light poles, irrigation systems, and associated conduits.
Georgia Piedmont Technical College
Purchase a sole brand Optometry Pkg & Software, install & training for its Opticianry Program. Digital Optometrics Advance Package-Software; Topcon CC-100 with infrared emitter for CV5000/S, Retinal Camera:iCare DRS plus; Digital Phoropter, Topcon Interface kit for CV5000/S; Video Slit Lamp: Mediworks S390L Firefly; Automated Tonometer-Reichert7 NCT.
Posted Date
May 28, 2025
Due Date
Jun 30, 2025
Release: May 28, 2025
Georgia Piedmont Technical College
Close: Jun 30, 2025
Purchase a sole brand Optometry Pkg & Software, install & training for its Opticianry Program. Digital Optometrics Advance Package-Software; Topcon CC-100 with infrared emitter for CV5000/S, Retinal Camera:iCare DRS plus; Digital Phoropter, Topcon Interface kit for CV5000/S; Video Slit Lamp: Mediworks S390L Firefly; Automated Tonometer-Reichert7 NCT.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
Georgia Piedmont Technical College
Purchase order for CampusLogic Student Forms with CampusMetric Subscription from Ellucian Company LLC for GA Piedmont Technical College. The subscription term is from August 1, 2024, to July 31, 2025, with a total purchase order amount of $34,740.00.
Effective Date
Aug 1, 2024
Expires
Effective: Aug 1, 2024
Georgia Piedmont Technical College
Expires:
Purchase order for CampusLogic Student Forms with CampusMetric Subscription from Ellucian Company LLC for GA Piedmont Technical College. The subscription term is from August 1, 2024, to July 31, 2025, with a total purchase order amount of $34,740.00.
Georgia Piedmont Technical College
Georgia Piedmont Technical College has purchased StudentForms with Insight from Ellucian CampusLogic Inc. The contract starts on August 1, 2022, and ends on July 31, 2023, for a total amount of $32,906.00.
Effective Date
Aug 1, 2022
Expires
Effective: Aug 1, 2022
Georgia Piedmont Technical College
Expires:
Georgia Piedmont Technical College has purchased StudentForms with Insight from Ellucian CampusLogic Inc. The contract starts on August 1, 2022, and ends on July 31, 2023, for a total amount of $32,906.00.
Georgia Piedmont Technical College
Order form for Georgia Piedmont Technical College for Tableau Cloud services, including Creator and Viewer licenses, with a contract start date of July 1, 2024, and an end date of June 30, 2025. The total price, inclusive of taxes, is $3,645.00.
Effective Date
Jul 1, 2024
Expires
Effective: Jul 1, 2024
Georgia Piedmont Technical College
Expires:
Order form for Georgia Piedmont Technical College for Tableau Cloud services, including Creator and Viewer licenses, with a contract start date of July 1, 2024, and an end date of June 30, 2025. The total price, inclusive of taxes, is $3,645.00.
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Georgia Piedmont Technical College
This strategic plan outlines three core goals: strengthening student success, enhancing the college's public image and engagement, and optimizing internal operations. It focuses on expanding educational programs, improving student completion and career readiness, and enhancing support services. The plan also aims to increase visibility through marketing and community engagement, promote employee development, and ensure operational efficiency by streamlining processes, investing in technology, securing funding, and improving facilities.
The strategic plan focuses on exceeding the Technical College System of Georgia (TCSG) average for graduation and retention rates. It aims to maintain a consistent job placement rate of 99.0% through 2025. Additionally, the plan seeks steady improvement in the IPEDS graduation rate, targeting rates at or above historical peer institution averages, while considering disaggregate data of gender, race, ethnicity, and financial need.
The document outlines student achievement benchmarks and data for GPTC, focusing on graduation rates (IPEDS and TCSG), retention rates, and job placement rates. It compares GPTC's performance against peer institutions and TCSG averages, setting targets for improvement through 2025. The data includes breakdowns by gender, race/ethnicity, and financial aid type.
The document presents data on GPTC's retention, placement, and graduation rates, comparing them against TCSG peer institutions. It outlines benchmarks for retention (65% in AY 2022 to 72% in AY 2025), aims to maintain a 99% placement rate through 2025, and sets graduation rate targets (74% in AY 2022 to 77% in AY 2025). Additionally, it includes IPEDS graduation rates, broken down by gender, race/ethnicity, and Pell recipient status, with benchmarks for improvement through AY 2025.
The strategic plan focuses on improving graduation and retention rates within the Technical College System of Georgia. It includes specific benchmarks for IPEDS graduation rates, overall graduation rates, and retention rates, with the goal of exceeding the TCSG average. The plan also aims to maintain a consistent job placement rate of 99.0% through 2025.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Georgia Piedmont Technical College's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database