Phase Three Stabilization and Repairs To the Lincoln Normal School Gym
Posted
Aug 10, 2026
Sep 10, 2026
The scope of the work includes but is not limited to Base Bid: Structural repairs at all existing steel columns in gymnasium, CMU and brick masonry work, and hazardous materials abatement. Add Alternate No. One: Removal and replacement of H.M. doors and frames, removal and replacement of metal porches and concrete work, associated re-grading for positive drainage, removal of various interior CMU walls and fixtures.